Page 73 - demo
P. 73
) (
ا م
: در م
ا را
اه SPSS
ا Vensim IBM ANN KNN
د و Matlab Modeler
* * * * * * * * * * * * * * * * * * * * * * * * *
A new model based on
Ozcan algorithm for preventive
Artificial Bee Colony
- - * - - - * - - - - - - - - - - * * * - - - * * Simsir. replacement scheduling
&
maintenance with
2019 in continuous production
lines
Integrated control policy
Seiti ,et
of production and
- - * - - - * - - - * - - - - - - * - - * - - * * al. preventive maintenance
2019 for a deteriorating
manufacturing system
Linn Quantitative analysis of
a conceptual system
- - - * - * - - - - - - * - - - - * * * * * * - * éusso dynamics maintenance
n,
performance model
et al. using multi-objective
2018 optimization
Kang & Integrated control policy
of production and
- - * - - * - - - - - - - - - - - * * * - * - * * Subram preventive maintenance
aniam.
for a deteriorating
2018 manufacturing system
Alra Simulation-based
optimisation of
- - * - * - - - - - - - - - - - - - - * - * - - * bghi , maintenance systems:
et
al. Industrial case
2017 studies
ا اه ت ای ا ا دا رد د م اه ی م اه ت ای یا م - و