Page 90 - Attachments 8-4-16 (106pp)
P. 90

10.2.0 INTERNAL COMMON PARTS
10.2.1 Generally
10.2.2 Repairs Etc
draught strip by others
Provisional Quantity
Provisional Sum
10.2.3 Redecoration
10.2.4 Cleaning to Terrazzo Surfaces
Chemical clean only wet abrasive not suitable for a stair
CONTRACT INSTRUCTIONS ADDED ITEMS
A
A
B
C
D
E
F
G
H
I
J
K
L omitted M omitted N omitted O omitted P omitted Q omitted R omitted S omitted T omitted U omitted V omitted W omitted
A B C D E F G H I J K
10 m2
pre contract pre contract pre contract pre contract pre contract pre contract pre contract pre contract pre contract pre contract pre contract pre contract
45
£
£
£
£
£
inc
inc
£
£
£
inc £- £- £- £- £- £- £- £- £- £- £- £-
£ 7,325.00
£-
450.00 50.00 50.00 35.00 15.00
187.00 922.00 477.00
100% 100% 100% 0% 100%
100%
100% 100% 100% 100% 100%
£
£
£ £-
£
15.00
£
7,325.00
£ £ £ £ £
1,522.80 2,607.00 200.00 1,400.00 453.00
450.00 50.00 50.00
omitted pre contract
others others others
£ £ £
187.00 922.00 477.00
C.Ino1 C.Ino2 C.Ino3 C.Ino4 C.Ino5 C.Ino6
1 2
3
as attached as attached as attached as attached as attached as attached
Other additions
8 pots of sample paints
additional undercoat to internal windows due to colour change.
Disconnecting, lifting casings and slabs from roof and setting aside slabs, plus removing debris from site. (also isolating pipe as still live)
£ £ £ £ £
1,522.80 2,607.00 200.00 1,400.00 453.00
contract sum
OMITS ADD
£
£ £
63,828.00
17,036.60 6,182.80
£
17,036.60
£ 6,182.80
ADD ADD
ADD
£ 139.20
£ 180.00