Working hours shall be limited to between 08.00 hrs and 17.00 hrs Monday to Friday. Noisy works shall not be commenced until after 09.00 hrs each day. No weekend working shall be permitted.
A Adjoining Premises
The contractor is to carry out the works at such times and in such a manner as to cause the minimum of inconvenience to the occupiers of the adjoining buildings. The public footpath and roadways and the paths, roads and areas on the site are to be maintained in a clean order, free from stored materials and rubbish at all times.
B Form of Contract
The Form of Contract will be the JCT Minor Works Building Contract, 2005 edition, as amended by Amendment 1, issued April 2007. The following insertions and deletions are to be made in the Contract Particulars:-
See Page 3 for details A Insurances
The contractor shall hold insurances to properly indemnify the employer and to comply with the requirements of Clauses 5,1, 5.2 & 5.3 of the Conditions of Contract. The contractor will be required to show evidence that adequate insurances are held.
The employer shall take out as necessary and maintain for the duration of the contract a Joint Names Policy in respect of loss or damage to the existing structures due to any of the Specified Perils to comply with Clause 5.4.B 1.1 of the Conditions of Contract.
The employer shall take out as necessary and maintain for the duration of the contract a Joint Names Policy for All Risks Insurance in respect of the Works to comply with Clause 5.4.B 1.2 of the Conditions of Contract.
A Samples
Where formally requested, samples of materials to be used in the execution of the works shall be deposited in the (surveyor's) office free of charge before such materials are ordered in bulk and no materials shall be delivered on the site until a sample of the same has been approved.
All materials to be used in carrying out the work arising from variation orders shall be as specified hereinafter, unless the specification is altered by the instructions within the particular variation order.
B Interpretation of Terms
The terms 'fix', 'lay' etc., shall be interpreted as 'supply and lay', 'supply and fix' etc.