Page 8 - Demo
P. 8

Scope of Works - Mitre House, Kings Rd (614)
    614 Mitre House, 124 Kings Road, London SW3 4TP
Refurbishment of the Common Parts
 3.5.2 3.5.3
3.5.4 3.5.5 3.5.6 3.5.7 3.5.8 3.5.9 3.5.10
3.5.11
3.5.12
The existing PIRs are to be re-positioned outside the Tenant flats so that they are located centrally and not above a single door.
The boxing to the electrical equipment adjacent to the fire escape door is to removed and disposed of. A fireproof enclosure is to be installed around the electrical equipment. The contractor is to include some form of protection on the corners of the enclosure to prevent injury to Tenants and visitors.
The fire door and frame leading out onto the fire escape is to be rubbed down, prepared and decorated in accordance with manufacturer's recommendations.
All glazing to the fire door and fanlight is to be thoroughly cleaned to remove all stains and marks.
The ceiling is to be rubbed down, prepared and decorated with 1no undercoat and 2no top coats of good quality paint.
The walls are to be rubbed down, prepared and decorated with 1no undercoat and 2no top coats of good quality paint. Colours to be agreed with the client.
The upstand at the base of the wall is to be professionally cleaned to remove all stains and marks. The colour is to be revitalised and left in good order.
All cabling is to be tested and redundant cabling removed. The remainder of cabling is to be boxed in, unless it can be neatly clipped in place.
The entrance doors, frames and adjacent panelling currently finished with a varnish coating are to be rubbed down, prepared and re-varnished. Colour of varnish to be agreed with the client.
The contractor is to present options to the C.A. for either replacing the existing lobby doors with new items to ensure they are FD30 or better, so as to comply with Building Regulations, or confirm if the existing can be made to perform as FD30 or better fire doors. The contractor will also need to confirm if the half glazed panels to the lift lobby also need to be replaced.
The floor surface adjacent to the Tenant flats is to be thoroughly cleaned. This may include honing, sealing and polishing the floor to revitalise the finish.
3no 1no
1no 5no Item Item Item Item 3no
1no
Item
               3.6
3.6.1 3.6.2 3.6.3 3.6.4
3.6.5 3.6.6
2nd Floor (Lift Lobby)
The ceiling is to be rubbed down, prepared and decorated with 1no undercoat and 2no top coats Item of good quality paint.
The walls are to be rubbed down, prepared and decorated with 1no undercoat and 2no top coats Item of good quality paint. Colours to be agreed with the client.
The terrazzo upstands are to be thoroughly cleaned. This may include honing, sealing and Item polishing the steps to revitalise the finish.
The contractor is to present options to the C.A. for either replacing the existing lobby doors with 1no new items to ensure they are FD30 or better, so as to comply with Building Regulations, or
confirm if the existing can be made to perform as FD30 or better fire doors. The contractor will
also need to confirm if the half glazed panels to the lift lobby also need to be replaced.
The floor surface in the lift lobby is to be thoroughly cleaned. This may include honing, sealing Item and polishing the floor to revitalise the finish.
The existing light fitting is to be carefully removed and disposed of. A new light fitting is to be 1no installed and as part of the installation, the contractor is to review the location of the fitting and
allow for the new fitting to be located in a position to meet with the Building Regulations.
12.03.20
7