Page 23 - Parameter C
P. 23

AREA II- PARAMETER C:

                     FACULTY ADEQUACY AND

                     LOADING





                   SYSTEM – INPUTS AND

                   PROCESSES







                   S.2.   There is a provision for incentives

                   of overload teaching in accordance with

                   the CMO of the program and/or

                   institutional guidelines.
   18   19   20   21   22   23   24   25   26   27   28