Page 180 - Shaping A Sustainable Future
P. 180
Conclusion
We visited J316 on 23rd October 2020 on request by
Mr Ng Zhen Hui after successfully installing all the 24
solar panels and their related equipment (Inverter and
30 lithium batteries). The following are photos (Figure
5 to 11) taken at the site showing the solar panel
infrastructure.
Figure 7: Cables for transferring energy to an inverter.
Figure 5: Solar panels installed facing outside.
Figure 6: Solar panels on the other side of the warehouse. Figure 8: Inverter to convert DC to AC power.
178