Conclusion


            We visited J316 on 23rd October 2020 on request by
            Mr Ng Zhen Hui after successfully installing all the 24
            solar panels and their related equipment (Inverter and
            30 lithium batteries). The following are photos (Figure
            5  to  11)  taken  at  the  site  showing  the  solar  panel
            infrastructure.










                                                                   Figure 7: Cables for transferring energy to an inverter.










                  Figure 5: Solar panels installed facing outside.























              Figure 6: Solar panels on the other side of the warehouse.  Figure 8: Inverter to convert DC to AC power.