Page 13 - CEL Utilities Brochure - 2020
P. 13
Key Features
────
Site clearance of existing internal
road network RTE Campus
────
Site clearance of existing
footpaths and cycletracks on
Stillorgan Road
────
Construction of new drainage
network
────
1100m² of new footpaths to DCC
standards
────
200m² of off‐road cycle track to
DCC standards
────
2400m² of full road construction
────
Design and implementation of
traffic management on the N11 to
facilitate the instatement of the
new junction
────
Construction of 55 no block‐built
gully chambers to DCC standards
────
Construction of 20 no. pre‐cast
stormwater manholes ranging
between 1200mm and 1800mm
diameter
────
Installation of 400m ACO drainage
kerbing, 405mm and 305mm
────
RTÉ NEW N11 JUNCTION Installation of 150m ACO road
drainage 300mm deep, including
several sump units
Client: RTÉ Donnybrook
Contract Value: Sensitive
Location: Raidió Teilifís Éireann Dublin
General Description
This project was the construction of a new signalised junction and new road
layout inside the RTE Campus.