TEST SHEET
Testing and Verification
Test results certificate
All test are to be carried out in accordance with AS/NZS3000:2018. Section 8. You need to be familiar with this before undertaking this testing. Testing is not a one time event at the end of a project. You need to be constantly checking your installation.
Site address: Job Number:
Your name: Date:
Section 1: Non-live testing. Once completed email results to admin@gtelectrical.co.nz before moving on to section 2. 1.1 Visual inspection:
Pass Fail
Section 8.2.2 has a detailed check list ensure all requirements are fully met. Comment:
I have visually inspected installation to section 8.2.2 of AS/NZS3000:2018
1.2 Earth resistance and bonding test:
Main earthing conductor: Oven Circuit: Lighting circuit 1: Lighting circuit 2: Lighting circuit 3: Water heater circuit:
Bonding of exposed metal
Oven: ohm Water heater: ohm ohm ohm ohm ohm
Results for earth resistance can be found section 8.3.5.2 and Table 8.2
Test lead resistance:
Power circuit 1: Power Circuit 2: Power Circuit 3:
1.3 Insulation resistance test:
Main conductor:
Oven Circuit: Lighting circuit 1: Lighting circuit 2: Lighting circuit 3: Water heater circuit:
The results above fall under the maximum allowable resistances for this installation.
M Power circuit 1: M M Power Circuit 2: M M Power Circuit 3: M
M M M
M M M
The integrity of the insulation has been stressed with 500V DC and the resistance is above 1M
If you have ticked all three parts of section 1 please email your results to admin@gtelectrical.co.nz and move onto section two.