 TEST SHEET
   Testing and Verification
Test results certificate
All test are to be carried out in accordance with AS/NZS3000:2018. Section 8. You need to be familiar with this before undertaking this testing. Testing is not a one time event at the end of a project. You need to be constantly checking your installation.
Site address: Job Number:
Your name: Date:
Section 1: Non-live testing. Once completed email results to admin@gtelectrical.co.nz before moving on to section 2. 1.1 Visual inspection:
          Pass Fail
Section 8.2.2 has a detailed check list ensure all requirements are fully met. Comment:
 
I have visually inspected installation to section 8.2.2 of AS/NZS3000:2018
 1.2 Earth resistance and bonding test:
Main earthing conductor:  Oven Circuit:  Lighting circuit 1:  Lighting circuit 2:  Lighting circuit 3:  Water heater circuit: 
Bonding of exposed metal
Oven: ohm Water heater: ohm ohm ohm ohm ohm
Results for earth resistance can be found section 8.3.5.2 and Table 8.2
Test lead resistance: 
Power circuit 1:  Power Circuit 2:  Power Circuit 3: 
               
               
1.3 Insulation resistance test:
Main conductor:
Oven Circuit: Lighting circuit 1: Lighting circuit 2: Lighting circuit 3: Water heater circuit:

The results above fall under the maximum allowable resistances for this installation.
M Power circuit 1: M M Power Circuit 2: M M Power Circuit 3: M
            M M M
M M M
      The integrity of the insulation has been stressed with 500V DC and the resistance is above 1M
If you have ticked all three parts of section 1 please email your results to admin@gtelectrical.co.nz and move onto section two.