HEALTH & SAFETY
TEST SHEET
Testing and Verification
SECTION 2: Live testing. Once competed please send results to admin@gtelectrical.co.nz
2.2 Polarity:
Polarity must be done with trailing lead.
Additional Results and notes:
Consumer mains:
(first point of supply accessible to you.)
Sub Mains:
Final sub circuits:
Range/oven
Final sub circuits:
Water heater
Final sub circuits:
Power
Final sub circuits:
Lighting
V Phase to independent earth V Neutral to independent earth V Earth to independent earth
V Phase to independent earth V Neutral to independent earth V Earth to independent earth
V Phase to independent earth V Neutral to independent earth V Earth to independent earth
V Phase to independent earth V Neutral to independent earth V Earth to independent earth
V Phase to independent earth V Neutral to independent earth V Earth to independent earth
V Phase to independent earth V Neutral to independent earth V Earth to independent earth
2.3 Fault Loop:
Polarity is correct and voltages are within the required vales for this installation.
A
A
A
A
A
A
A
A
A
A
This installation has been suitably check to ensure the circuit protection will operate correctly under fault condition.
Tick pass if RCD passed all 5 RCD tests. It is a requirement to record the results of 1x and 5 x
Consumer mains: Sub Mains: Range/oven: Water heater: Lighting circuit 1: Lighting circuit 2: Lighting circuit 3: Power Circuit 1: Power circuit 2: Power Circuit 3:
2.4 Residual current device:
RCD 1:
RCD 2: RCD 3: RCD 4:
30mA mS 150mA mS 30mA mS 150mA mS 30mA mS 150mA mS 30mA mS 150mA mS
RCD tests.
No trip at half the fault current Trip at 1 x required fault current Trip at 2 x required fault current Trip at 5 x required fault current Trip at 180dg 1 x fault current
Residual current devices installed in this installation preform as expected
Declaration: This installation has been tested and I can verify that it is safe for use.
Name:
Date of livening:
Signature: