Page 224 - Area IX Parameter D
P. 224

C                                       building  2-storey  new construction  under  Laboratory Simulation  and  Rooms Maintenance  and  Fabrication Laboratory/Digital  Testing  to conformed  and equipped,  designed,  industry  and  Standard Regulation  Training
                                                                              the                       be


                                                                              at       Tools/Programming/Multimedia  Repair  Laboratory/Usability  Laboratory  will  TESDA
                                                                              situated     and





                                      B                                                                 rooms

                                                                              be           Laboratory       standard,

                                                                              to                        laboratory

                                                                              Laboratories  following:  Graphics Laboratory/Prototyping  minimum






                                      A                                           the  Productivity  Networking  Visual  These





                                                                                  are  A)  B)  C)           CHED  standard.
   219   220   221   222   223   224   225   226   227   228   229