Page 306 - Manual-of-Operation-Merged
P. 306
CvSU MANUAL OF OPERATIONS
________________________________________________________________________
302
Specific management of the experiment (this include specific features
about the management of the experiment that are not included in the
treatments)
Cultural practices (i.e. land preparations, pest control, weed control,
fertilization, etc.)
E. REVIEW OF RELATED LITERATURE
This contains a thorough review of existing literature on problems of
similar nature. It provides concepts and approaches to the proposal. It also
identifies gaps in existing knowledge, helps determine whether the proposed
study is in the proper direction or not and eliminates the possibility of
duplication.
F. BUDGETARY REQUIREMENTS
The budget requirements include the following:
Personal Services (PS) – total requirement for wages, honoraria, additional
hire and other personal benefits
Maintenance and Other Operating Expenses (MOOE) – total requirements
for supplies and materials, travel expenses, communication and other
services.
Capital Outlay (CO) – total requirement for facilities and equipment needed
by the project.
G. WORKPLAN
A tabular matching of objectives per study, expected outputs per
objective, and activities per output organized in Gantt Chart. Each activity
for an expected output is viewed against time for its conduct and completion
(see attached form).
H. LITERATURE CITED
This includes the list of papers cited in the proposal to serve as
reference for the reviewer. It must be arranged alphabetically by author and
year following the standard format.
302