Page 11 - QR IMER BOOSTER15
P. 11

IMER INTERNATIONAL S.p.A.

                                      Fig. 24                                            Warning!

Now restart the cleaning procedure with the hoses connected to                                 Every meter of D.50mm hose contains around 2 L of
the machine.                                                                             material, while every metre of D.100 hose contains around 8 L
                                                                                         of material. If the hose is very long, the material may spill out
16.2 CLEANING WITH COMPRESSED AIR                                                        of the tank.

You will need:                                                                           17. MAINTENANCE
- A compressor
- A sponge of a size suited to the diameter of the hose                                        Do not move the machine with the hopper raised or the
- A container to recover the sponge.                                                     tank full of material

Connect the sponge recovery container (Fig. 23 Ref. 2) to the                                  Maintenance must be performed by expert personnel,
                                                                                         after switching the machine off.
the hose inlet (wet and of a suitable diameter) (Fig. 25 Ref. 1) and
connect the provided cleaning device with ball valve (Fig. 25 Ref.                       If the pump stops due to a fault during operation, clean the ma-
2), making sure it is correctly locked.                                                  chine and pipelines immediately.
                                                                                         Make sure there are no oil leaks from the hydraulic system, engine
Warning!                                                                                 or the compressor during the stop. In case of doubt, check the oil
      The sponge may be expelled violently from the end of
                                                                                         Diesel engine manual.
the hose: lay out the terminal hose correctly; if the hose is
blocked, the sponge will not be expelled. Switch off the air                             17.1 DAILY MAINTENANCE
supply by pulling the lever (Fig. 25 Ref. 2).                                            Check that there is enough clean water in the tank (Fig. 18 Ref. 4)
                                                                                         and top it up if necessary.
      Before opening a material delivery hose coupling, make
sure the safety lever is open, the pressure gauge (Fig. 19 Ref.                          and pumping pipe; if this is the case, replace the pistons.
9) reads zero bar and there is no residual pressure in the                               To drain the tank, pull the evacuation lever; then close it again and
hoses.
                                                                                         Replace the lubricating water at least once a week.
      The operator must be specially instructed to do this job;
in particular, before opening a coupling, he must check for                              In cold conditions, empty the tank out at the end of the shift and
residual pressure in the hoses and make sure that no-one                                 use antifreeze liquid.
is in the vicinity. This hazardous operation must always be
supervised by an expert operator and done with the utmost                                Every day, at the end of work and with the machine running,
caution.                                                                                 grease the affected points with the greasers located at (Fig. 19
                                                                                         Ref. 11) . A grease pump is supplied with the machine for that
During cleaning, do not allow anyone to loiter, for any reason                           purpose.
whatsoever, in the vicinity of the terminal hose.                                        The operation is complete when grease comes out of the shaft
                                                                                         gaskets and couplings.
                                                              2                          Do not apply more grease, so as not to pollute the material to be
                                                                                         pumped at the start of work.
                                                1                                        Every day, check correct operation of the safety devices, and in
                                                                                         particular the grill safeties (Fig. 18, Ref.2), and the emergency
                                                                                         pushbutton. Top-up the fuel tank at the end of work. Check the
                                                                                         engine oil level and the Diesel fuel tank level before starting work.
                                                                                         At the start of work, make sure there were no oil leaks from the hy-
                                                                                         draulic system, engine or the compressor during the stop. Check

                                                                                         17.2 WEEKLY MAINTENANCE
                                                                                         Every week a specialised person must grease all the necessary
                                                                                         points on the machine and also perform a general machine check.

                                                                                         In particular, make sure:
                                                                                         - the mixer shaft and S valve seals are in good condition;
                                                                                         - the S valve is clean and not worn;

                                                                                         - the engine and hydraulic system radiators are clean;

                                                                                         lyte are correct;

                                          Fig. 25

16.3 SUCTION CLEANING
If pumping is vertical, the sponge can be inserted at the end of the
terminal hose, and suction activated by turning the switch to the
left (Fig. 19 Ref. 7). The concrete will be drawn back into the tank.

                                                                                     39