Page 10 - ICG SOQ
P. 10
Projects History (continued)
ETC Completed Project: Washington State Department of Corrections, McNeil Island, WA
Consultant:
Project Manager: Phone:
Client:
Project:
Soil Volume:
Soil Type: Contamination Type: Pre-treatment levels: Post-treatment levels: Authority
Parametrix
Brian Pippin
425-822 8880 Department of Correction McNeil Island Facility UST’s 7,458 tons
Clay, sand
Diesel, gasoline
9,000 ppm
To regulatory levels WTPH-G <5mg/kg; BTEX <0.005 mg/kg (each compound), <25 mg/kg TPH Washington State Depatment of Environmental Conservation
ETC Completed Project: Philip Services, Old Eagle School Tank Farm
Consultant:
Project Manager: Phone:
Client:
Soil Volume:
Soil Type: Contamination Type: Pre-treatment levels: Post-treatment levels: Authority:
Philip Services
Geo Kany
907-272-9007
Philip Services
2,646 tons
Gravely sand
Diesel, Gasoline
6,000 mg/kg DRO
To regulatory levels ADEC Method 1 Category A: DRO 200 mg/kg , Benzene below 0.02 mg/kg, RRO 2000 ADEC
ETC Completed Project: Suntex Project, Slough, England, UK
Consultant:
Project Manager: Phone:
Client:
Soil Volume:
Soil Type: Contamination Type: Pre-treatment levels: Post-treatment levels: Authority:
RH Consulyancy Services Tony Riall
01937 588376
MEL
2,100 tons
Sandy gravel
DRO, Min Oil, PRO, PAH
TPH 4500 mg/kg
To regulatory levels of 100 mg/kg
EA (Environmental Agency of England)
ETC Completed Project: Petro Star, Coldfoot, Ak
Consultant:
Project Manager: Phone:
Client:
Soil Volume:
Soil Type: Contamination Type: Pre-treatment levels: Post-treatment levels: Authority:
Nortech Environmental & Engineering Consultants Peter Beardsley
907-452 5688
Petro Star, Inc
6,000 tons
Gravely sand
Diesel, Benzene
8,000 mg/kg , 0.052 mg/kg respectively
To regulatory levels ADEC Method 1 Category A: DRO 100 mg/kg , GRO 50 mg/kg, RRO 2000 mg/kg ADEC
10