Page 5 - Special System Services (2019)
P. 5

„ „24/7/365 Emergency response team
                                               „ „ABF (Air Blown Fiber) both micro and conventional loose

                                                   tube short to long haul

                                               „ „CAD, BIM 5D modeling experience
                                               „ „Certified, experienced field team

                                               „ „Custom assembly, prefabrication, kitting, warehousing

                                                   and logistics management

                                               „ „Design review and constructability

                                               „ „Design services for systems, electrical and cable plants,
                                                   design-build, design-assist and electrical engineering

                                               „ „Estimating and opinion of cost reviews

                                               „ „Maintained and stocked fleet for any install
                                               „ „QA/QC playbook for all systems and cable plants

                                               „ „Rack and stack, move/relocation management

                                               „ „Safety plans for all scopes

                                               „ „Service work (adds, moves and changes)

                                               „ „Skilled project management team
                                               „ „Splicing (fiber splicing, fusion, mechanical, ribbon and

                                                   high pair count copper)

                                               „ „Structured cabling
                                               „ „Survey of existing installations and asset identification

                                                   and tracking database management

                                               „ „Third party testing

                                               „ „Underground utilities (trenching, boring, conduits, power,
                                                   pull boxes and manholes)
   1   2   3   4   5   6   7   8   9   10