AFCO AIR CARGO


                  FACILITY BWI BUILDING H

                                                                                                                                                                                                    10TH & O STREET


                                                                                                                                                                                                    CAPITOL ANNEX
                                   LOCATION: Baltimore, MD
                     CLIENT: Maryland Aviation Administration
                    GENERAL CONTRACTOR: Haskell Company                                                                                                                                             SWING SPACE
                                            BUDGET: $5.7M                                                                                                                                                                                          PROJECT PROFILES

        This project was complex due to its compressed schedule
           and large scope. During the course of the project, the
            owner determined that the needs were greater than
          anticipated and increased the scope of work. Rosendin
              employed 80 field employees on the job, doubling
             the average number of employees on-site, in order
             to complete this project on time with the increased                                                                      LOCATION: Sacramento, CA
            scope. This made it a large task to control the safety
         while work continued 14-16 hours a day, 7 days a week                                                                        CLIENT: State of California Department of General Services
           for 2 months. In the last month of the project, a roller                                                                   GENERAL CONTRACTOR: Hensel Phelps Construction
          floor was scheduled for installation to assist in moving                                                                    BUDGET: $52 Million
       packages once the facility was open. Rosendin completed
         all of the high work prior to the floor installation as lifts                                                                The 10th and O Street Capital Annex Swing Space will temporarily house approximately 1,250
             and ladders would not be usable after the floor was                                                                      legislative and executive elected officials and staff from the Capitol Annex until the new Annex project is
        installed. The team used many prefabricated systems for                                                                       completed. The building will then be jointly used as office space for legislative and executive employees.
           lighting to increase efficiencies of scheduled electrical                                                                  The 10-story building is approximately 472,600 gross square feet and includes function space for committee
         activities. Additionally, Rosendin had the lighting vendor                                                                   hearings, caucus meetings, general meeting rooms, and legislative and Executive Branch offices, as well as
            provide all of the light fixture whips with the fixtures.                                                                 parking. The project is being designed to be one of the most sustainable state office buildings to house
          This project was completed on time and under budget.                                                                        elected officials in the country, with the goal of LEED Gold. To meet that certification level, the building will
                                                                                                                                      feature low water use fixtures, a high-performance building facade, materials with high recycled content, day-
                                                                                                                                      lighting, native vegetation on the surrounding site and terraces, as well as LED lighting throughout. Upon
                                CHARLOTTE DOUGLAS                     LOCATION: Charlotte, NC                                         completion, the 10th & O Street building will be Zero Net Carbon and will also achieve Zero Net Energy
                                                                                                                                      through energy efficiency and off-site power generation.
                                                                      CLIENT: City of Charlotte
                          INTERNATIONAL AIRPORT                       GENERAL CONTRACTOR: Messer Construction

                                                                      BUDGET: $2.7 Million
                                                                      Destination CLT is a multi-billion dollar investment                                                      PROJECT WILDCAT
                                                                      program to renovate and expand the Charlotte                                   LOCATION: Charlotte, NC
                                                                      Douglas International Airport. To date, Rosendin                                  CLIENT: Lincoln Harris
                                                                      has provided electrical contractor services for
                                                                      three separate phases of the Destination CLT                           GENERAL CONTRACTOR: Gilbane
                                                                      initiative; Concourse A expansion and renovation                                     Building Company
                                                                      and Concourse B renovation. The improvements to                                    BUDGET: $10 Million
                                                                      the airport have included nine gates, high ceilings,
                                                                      natural light, terrazzo flooring and sustainable,                 Project Wildcat is a 688,312 square foot,
                                                                      high-tech windows. New traveler amenities include                   twenty-four-floor core & shell project
                                                                      seating with wireless charging armrests and local                   that will soon become the new home
                                                                      craft beer; other key upgrades involve heating and                   of Honeywell Corporation in Uptown
                                                                      air conditioning systems, electrical, fire alarm and                  Charlotte. Honeywell will occupy 10
                                                                      sprinkler systems. The restrooms received new                    floors of the building, with the remaining
                                                                      sinks, touchless faucets, and soap dispensers as well                floors including ground-floor retail, a
                                                                      as counters, mirrors and tile finishes. A new Flight             lobby, and an 800-space parking garage.
                                                                      Information Display System was installed in addition             The building is located directly across the
                                                                      to a new user-friendly Wi-Fi system. When all of                 street from Bank of America Stadium and
                                                                      the renovations are completed, Charlotte Douglas                                 covers two city blocks.
                                                                      International Airport will be transformed into a
                                                                      bright, innovative, customer-focused destination.



       16  |  THE FEEDER