Page 60 - THE JOURNEY
P. 60
04 This rehabilitation hospital project, located in Jeddah, is designed in three phases to cater to the medical and park- About
ing needs of the facility. The first phase includes two key buildings: the medical building and a parking structure. The
medical building, which serves an operating capacity of 100 beds, is spread across five floors (ground, first, second,
third, fourth) and includes a basement. The building, covering a total construction area of 14,000 m², is situated in The Project
the central western part of the project site. Its design ensures the efficient functioning of its core spaces, with essen-
04-3 tial areas located centrally to facilitate ease of use, especially during emergencies. The building’s perimeter includes
additional spaces that offer flexibility and quick access, enhancing the overall user experience.
REHAB Ground Floor The medical Building The parking Building
Operating capacity of 100 beds, consisting
northern part of the project and occupies a
of Five Floors , ground, first, second, third, The parking building is self-contained in the
2
fourth, in addition to basement already in the
total construction area of 7689 M , Consist of
HOSPITAL site. 7 floors , 150 car lot .
The building is designed to make maximum
The building occupies a total construction
area of 14,000 M and is located in the central use of the space, by placing the motion
2
western part of the project. battery at the center of the building.
Complete building serves itself by means of There are acceses between the parking and
basic spaces that are the main nerve of the the medical building through certain floors , to
building with the help of spaces come on the avoid Crowding in emergency cases.
building perimeter providing ease of use in
emergency case.
The second building, dedicated
to parking, is strategically located
in the northern part of the site. It
covers a total construction area
HEALTH CARE
of 7,689 m² and consists of sev- K S A
en floors, offering 150 car park-
ing spaces. The parking structure
is designed with an emphasis on
space optimization, featuring a
central motion battery that en-
hances circulation and accessibility
within the building. To improve
connectivity and convenience, the
parking building is linked to the
medical building via certain floors,
allowing for smooth and quick
access between the two. This de-
sign feature is crucial in preventing
crowding, especially during emer-
gency situations, ensuring efficient
movement of people and vehicles
throughout the facility.
24 Clinc for Outpatients. 332M Emergency Dep. 146M Vistors Cafe.
2
2
157M Lab for male & female. 146M Staff Cafe.
2
2