(carbon steel)
14 CLNTP-016 burner base set 1 (carbon steel)
15 CLNTP-017 flue tube condenser Set 1 Φ630*6000*6mm (carbon steel)
16 CLNTP-019 water tank (cooling set 1 Tank Built in client place
tower) (concrete&brick)
Cooling tower: 60t/H, 1.5KW
Technical Parameter
ITEM CONTENTS
24-capacity 6 MT
Operating pressure Constant pressure
Maximum Height 9 meters
Reactor rotate speed 0.4 turn/minute
Power in total 24 kw/hour
Reactor size Ø 2200x5100x12 mm
Consumption
1. Total Power: 24 KW/H (in production not all motors start at same time).
Other Fuel Consumption
3
2. Cooling circuit water: 60 M /H in total (water is recalculated and the
more the water flow, the better the cooling down). Coal: 60KG/Ton material
3
3. Fuel consumption: 70 m nature gas processing one ton tire in average. LPG: 50-55KG/Ton material
Diesel: 55-65KG/Ton material
4. Space for machine: W10MxL25MxH10M at least.
5. Workers ∕ shift: 4 to 6 workers which can be divided by two groups.
After Service
Installation and Training
Engineer for installation guiding, testing, commissioning and operators
Turn Key Package
training.
Installation period
Anticipate period is 30 working days.
Installation Charge
Client cover engineer’s round-trip tickets+ board and lodging+ phone
calling charge and related basic daily expenses, as well as engineer salary
(80USD one day one person).
Warrantee
12 months guarantee
Onsite services
Regular phone call visiting