(carbon steel)
             14    CLNTP-016   burner base         set   1         (carbon steel)
             15    CLNTP-017   flue tube condenser   Set   1       Φ630*6000*6mm (carbon steel)
             16    CLNTP-019   water  tank  (cooling  set   1      Tank Built in client place
                              tower)                               (concrete&brick)
                                                                   Cooling tower: 60t/H, 1.5KW




            Technical Parameter


            ITEM                          CONTENTS
            24-capacity                   6 MT
            Operating pressure            Constant pressure
            Maximum Height                9 meters
            Reactor rotate speed          0.4 turn/minute
            Power in total                24 kw/hour
            Reactor size                  Ø 2200x5100x12 mm




            Consumption

            1. Total Power: 24 KW/H (in production not all motors start at same time).
                                                                                 Other Fuel Consumption
                                      3
            2. Cooling circuit water: 60 M /H in total (water is recalculated and the
               more the water flow, the better the cooling down).                Coal: 60KG/Ton material
                                    3
            3. Fuel consumption: 70 m  nature gas processing one ton tire in average.  LPG: 50-55KG/Ton material
                                                                                 Diesel: 55-65KG/Ton material
            4. Space for machine: W10MxL25MxH10M at least.
            5. Workers  ∕  shift: 4 to 6 workers which can be divided by two groups.

            After Service

            Installation and Training
               Engineer for installation guiding, testing, commissioning and operators
                                                                                        Turn Key Package
                training.
            Installation period
               Anticipate period is 30 working days.
            Installation Charge
               Client cover engineer’s round-trip tickets+ board and lodging+ phone
                calling charge and related basic daily expenses, as well as engineer salary
                (80USD one day one person).

            Warrantee
               12 months guarantee
               Onsite services
               Regular phone call visiting
               Whole life time maintenance and wear parts supply