Page 18 - Spring 2018 issue v1
P. 18

18 Friends oF red rock canyon                                                                                                                                                                Friends oF red rock canyon     19




                                                                                                                                                                                                                          The photo to the
                                                                                                                                                                                                                       left was taken by
                                                                                                                                                                                                                       Will Rempel, (GBI)
                                                                                                                                                                                                                       at 4:15 pm, Satur-
                                                                                                                                                                                                                       day, November 25,
                                                                                                                                                                                                                       2017.
                                                                                                                                                                                                                          This image of
                  Walkway tiles are used for multiple reasons; some people want                                                                                                                                        parking and Scenic
                                                                                                                                                                                                                       Drive congestion
                  to recognize friends and loved ones who have passed, others                                                                                                                                          has become the
                  want to celebrate a milestone or special event. Other tiles                                                                                                                                          norm instead of the
                  are simply placed because the donors love Red Rock Canyon                                                                                                                                            unusual.
                  and want to leave their marks in a positive way.
                                                                                                                                                    e need you. The Bureau of Land         help the BLM managers decide how to manage
                                                                                                                                             W Management (BLM) and the Great              peak visitation within Red Rock Canyon.
                                                                        By Pat Williams and Cam Camburn                                    Basin Institute (GBI) really need your knowl-

                     his summer will mark the 17th Anniversary     During construction of the new Visitor Center                           edge, enthusiasm and physical presence. As you    We are recruiting volunteers to attend a three
                 T of the Red Rock Canyon Dedication Walk-      Complex, the Dedication Walkway was carefully                              all likely know, Red Rock Canyon is loved and   to four hour training session on Tuesday, April
               way. The Bureau of Land Management (BLM)         documented, disassembled and stored at Oliver                              visited by millions annually. This love of Red   10, beginning at 10 a.m. at the Red Rock Canyon
               approached the Friends of Red Rock Canyon        Ranch. The Walkway donors were notified that                               Rock Canyon creates an enormous amount of       Visitor Center Classroom to learn more about this
               board in early 2001 about creating a fund-raising   their tiles would not be displayed during construc-                     foot and road traffic that limits everyone’s ability   process and then help us collect data in the future.
               walkway. The walkway would consist of 12” x      tion but would be reinstalled in the new picnic area                       to safely enjoy the Canyon. The high seasonal
               12” Nevada quarried sandstone tiles and it would   after all work was finished. Friends went to great                       traffic also creates havoc on State Route 159.
               encircle the existing Tortoise Habitat. The Friends   lengths to ensure that the relocated tiles were both                  Vehicles, traveling to Red Rock Canyon from Las
               board agreed to take the                         installed correctly and were intact and legible. Ap-                       Vegas, routinely get stuck in lines of traffic that
               lead on this endeavor, and                       proximately 30 tiles were replaced, at no charge to                        stretch more than a mile from the entrance.
               Chuck Williams, then                             the original donor, due to breakage or other issues.
      Volunteers dedicated to the preservation of Red Rock Canyon
               Friends President,                               The walkway tiles were reinstalled in the spring                             We need you. The GBI is seeking volunteers
               created the policies                             of 2010 to coincide with the Grand Opening of the                          to help us monitor parking lot capacity around the
               and procedures. The                              new Visitor Center Complex.                                                Scenic Drive. The information you provide will
               first dedication tiles were
               installed in July 2001.                             Preparation for and installation of dedication
                                                                tiles is complex. The engraver’s art department
                  A special dedication area, commemorating the   prepares a proof for approval by the donor. Once                        Dedicated to the Ones You Love (Continued from page 18)
               victims of the 9/11 terrorist attack on America,   approved, a rub-                                                       sandblasting the templates with granite                   $66,600 in program support has been
                                          was installed on      ber template is                                                          granules. After sandblasting the letters                  generated from the 588 tiles that have
                                          September 26,         prepared which                                                           on each tile, the tiles are dusted off and a              been installed. The Dedication Walkway
                                          2001. Representa-     is placed by                                                             special Lithochrome paint is applied. The                 is located in the picnic area at the Red
                                          tives from Nellis     the engraver                                                             taped templates are removed and the area                  Rock Canyon Visitor Center Complex
                                          Air Force Base,       on a blank tile                                                          is carefully swept and examined. The tile                 and is viewed by the hundreds of thou-
                                          the City of Las       that has been                                                            donors are notified after the twice-yearly                sands of guests to the Conservation Area.
                                          Vegas and BLM         warmed to rid it                                                         installations are completed.
                                          First Responders,     of moisture and                                                                                                                       The minimum donation is $400 ($350
                                          and many elected      to chip away                                                                Dedication tiles may be ordered at any                 for Friends members) and the tile is
                                          officials took part   any “popped”                                                             time for the Memorial Day and Veteran’s                   guaranteed against breakage and for leg-
                                          in the September 29   areas, creating a                                                        Day installations. Proceeds from the                      ibility for two years. For further informa-
               ceremony honoring those who died in the attack.   smooth surface.                                                         tax-deductible (as allowed by law) dona-                  tion, contact the Walkway Coordinator
               The Red Rock Canyon 9/11 Victims Dedication      The engraver                                                             tions are used for the many programs and                  at 702-515-5360 or email us at tilesale@
               area is believed to be the first permanent remem-  then dons protec-                                                      services funded by Friends. More than                     friendsofredrockcanyon.org.
               brance in the nation.                            tive gear for
                                                                                         (Continued on page 19)


               the Rock - Volume 8 Issue 3                                                                                                                                                                                  Spring 2018
   13   14   15   16   17   18   19   20   21   22   23