Page 11 - 2001 DT 4 issues
P. 11
call LeNola McClure at 341-8137. Vol- ○ fencing at the Lost Creek parking lot to ○ visit the Friends website at
unteers were accepted for the audit and ○ ○ prevent further trail braiding, replace the ○ ○ www.friendsofredrockcanyon.org.
board nominating committees. ○ ○ fencing and signage at the Native Ameri- ○ ○
The Natural Resources committee ○ ○ can rock shelter, install steps from the ○ ○
○
has developed a project workbook list- ○ parking lot to the east trail head for safer 325
○
○
ing tasks individuals may select and ○ access to the trail, close off and replant ○ ○ by Pat Williams
○
implement at their convenience. On-go- ○ existing braided trails, build up the north ○ ○
○
ing larger group projects are also listed . ○ bank with rocks or timber and construct ○ ○ hat does that mean?? Three
○
The Environmental Education com- ○ an elevated walkway and viewing decks ○ ○ hundred twenty-five. No, its
○
mittee is expanding projects to the school ○ to protect sensitive riparian and desert Wnot the size of my car engine
○
○
○
district and Lake Mead. Those who ○ meadow. The work will be done by vol- ○ ○ or, fortunately, my weight. 325 is the
○
would like to work with children are ○ unteers and BLM staff, Master Garden- ○ ○ latest (drum roll please) member total for
○
asked to call Jay Bartos at 258-9895 ext. ○ ers and professional carpenters. ○ ○ Friends.
○
109 or Kathy August at 363-1921. ○ ○ The estimated cost for the project ○ ○ We gained nine new members dur-
○
The Membership committee reported ○ is $30,000 to $40,000 and will be funded ○ ing the recent EcoJam earthday celebra-
○
a 31% increase in membership and a ○ by Friends. ○ tion. These brave and hardy souls braved
○
○
○
24% increase in volunteer hours to 7,797 ○ ○ ○ the elements (cold, windy and periods
○
year-to-date. The goal is 355 members ○ ○ Dedication Walkway ○ of rain) to learn more about conserving
○
by the close of the fiscal year and 13,000 ○ ○ our natural resources and the environ-
○
volunteer hours; ○ ○ ○ ment. Literature about Red Rock Can-
○
The Cultural Resources commit- ○ ○ he quiet beauty of Red Rock Can- ○ yon and Friends was distributed to
○
tee has begun a survey of the ○ ○ yon has inspired and replenished ○ aproximately 100 people. The highlight
○
Brownstone Canyon cultural site. ○Tthe human spirit since the time of ○ of the day was the drawing for the
○
○
○ the Ancient Ones. Its rugged cliffs are ○ childrens prizesstuffed animals indig-
○
○
○ at once majestic and timeless, fragile and ○ enous to Red Rock Canyon. The adult
○
○
Restoration Plan for ○ vulnerable. ○ drawings, not nearly as much fun, were
○
○
Lost Creek ○ ○ Over the years, the Bureau of Land ○ a gift certificate to the RRCIA Gift and
○
○ Management (BLM) has received many ○ Book Store and Red Rock yearly passes
○
○
he Lost Creek Trail is home to a ○ requests from families wishing to pro- ○ awarded as prizes.
○
○
rare desert spring and meadow, a ○ vide a memorial for a loved one in the ○ ○ The following weekend, Friends
○
Tlovely seasonal waterfall and an- ○ canyon. A program of commemorative ○ participated in the annual Siena Spring
○
○
cient petroglyphs. Each year, upwards ○ benches was instituted in suitable areas ○ Festival. The weather was much more
○
○
of 10,000 school children visit the area ○ ○ in 1998, however the available locations ○ cooperative (long underwear and mittens
○
as part of their environmental education ○ ○ were quickly filled. ○ were not needed) and Friends gained 4
○
curriculum. ○ ○ In response to a growing number ○ new members.
○
Add to that number the thousands ○ ○ of requests, the BLM has designed a ○ ○ Many thanks to the stalwart Friends
of tourists and other hikers who frequent ○ ○ walkway to be located around the tor- ○ who gave up a Saturday to help spread
○
the trail annually and you have a serious ○ ○ toise habitat adjacent to the Visitor Cen- ○ the word: Rosemary Keough and Reg
○
problem with erosion, trail braiding, loss ○ ○ ter. A limited number of engraved natu- ○ Zeitlin shivered through EcoJam bravely
○
of vegetation and (of course) trash. ○ ○ ral red sandstone tiles will be placed in ○ and Willie Stephanich and Chuck Will-
○
The restoration plan, drawn jointly ○ ○ segments until the walkway is complete. ○ iams endured the Las Vegas mild
○
by Friends and the BLM, is to install ○ ○ The area is easily accessible and over- ○ breezes and dry heat for our Siena out-
○
looks the stunning Calico Hills. ○ ing.
○
○
○
Friends of Red Rock Canyon will Thanks also to the Red Rock Can-
administer the program with all proceeds yon Interpretive Assn. for the donations
applied to the preservation and enhance- of childrens prizes (some of the parents
ment of the Conservation Area. For got really ugly when their children didnt
information or an application, call win) and to Mark Rekshynskyj who do-
the Visitor Center at 363-1921 or nated Red Rock Canyon passes.
FORRC/June, 2001 Page 3