Page 12 - DETERMINATION OF HARD MASSS AND ROCK MASS
P. 12

CLASSIFICATION OF HARD MASS & ROCK



                                                                                       MASS








              02                                                             The determining whether an earthmoving procedure

                                                                             was a common excavation of hard mass or rock mass


                 CONFIRMATION OF                                             excavation, it was stipulated previously that the

                   HARD MASS AND                                             excavator used for trial excavation and subsequent

                      ROCK MASS BY

               MACHINERY (DIRECT                                             works should be in “good running condition.”

                          METHOD)                                            The trial excavation shall be carried out on a flat

                                  &

               (INDIRECT METHOD :                                            platform (as much as possible) in order to develop the

                 POINT LOAD TEST).                                           rated           horsepower                  at      maximum efficiency. All


                                                                             machineries shall be run in good condition and


                                                                             operated by skilled personnel approved by the S.O