Page 22 - DETERMINATION OF HARD MASSS AND ROCK MASS
P. 22

CLASSIFICATION OF HARD MASS & ROCK



                                                                                       MASS








              02                                                      The provision of point load test equipment at site for



                                                                      the abovementioned testing shall be at Contractor’s
                 CONFIRMATION OF

                   HARD MASS AND                                      own cost and time.

                      ROCK MASS BY

               MACHINERY (DIRECT                                      Both criteria (i.e. direct method and indirect method)

                          METHOD)                                     shall be fulfilled in order for the material to be classified

                                  &                                   as hard mass or rock mass. Confirmation test shall be

               (INDIRECT METHOD :                                     carried out again when in S.O.s opinion if the materials
                                                                                                                                 ’
                 POINT LOAD TEST).
                                                                      excavated are different from the trial excavation before.