Page 31 - PENGAWASAN KERJA RAWATAN TANAH
P. 31

PEMBEBANAN TAMBAHAN (SURCHARGE)


       SPESIFIKASI PIAWAI BANGUNAN JKR : SEKSYEN V – KLAUSA 3
       SPESIFIKASI PIAWAI JALAN JKR : SEKSYEN 20 – KLAUSA 20.3






                                                         Boleh atau tidak Unsuitable



                                                         Material (USM) digunakan


                                                         untuk surcharge???



                                                         Klausa 20.3.2 & Klausa 3.2:

                                                         Materials for use in surcharging shall be

                                                         suitable material conforming to the latest

                                                         revision of JKR Standard Specification for

                                                         Roadworks, Section 2: Earthworks.




                                                                     PUBLIC WORKS DEPARTMENT MALAYSIA
                                                                     P U B L I C   W O R K S   D E P A R T M E N T   M A L A Y S I A
   26   27   28   29   30   31   32   33   34   35   36