Conceptual Solution





      • Widen the road 5m to the original



      • Strengthening the unstable slopes by in-situ installation of soil

          nail




      • Connecting the nails with Reinforced Earth® system to form a

          TerraLink® structure. Soil nail creates a reinforced soil mass
          that is internally stable and  able to retain the ground mass

          in front of slope.



      • Similar to mechanically stabilized earth structure system, soil

          nail reinforcements are passive and can develop their

          reinforcing action through nail-soil interactions as the slope
          mass deforms during and subsequent to construction.