Page 22 - BATANGKALITERRALINK_SMNR_PIAWAI_JKR_2024
P. 22
Conceptual Solution
• Widen the road 5m to the original
• Strengthening the unstable slopes by in-situ installation of soil
nail
• Connecting the nails with Reinforced Earth® system to form a
TerraLink® structure. Soil nail creates a reinforced soil mass
that is internally stable and able to retain the ground mass
in front of slope.
• Similar to mechanically stabilized earth structure system, soil
nail reinforcements are passive and can develop their
reinforcing action through nail-soil interactions as the slope
mass deforms during and subsequent to construction.
20/02/2024 Seminar Spesifikasi Piawai JKR Malaysia bagi Kerja-Kerja Geoteknik 2024 22