Page 38 - BATANGKALITERRALINK_SMNR_PIAWAI_JKR_2024
P. 38
TerraLink Project at Taman Naga Emas, KL. 2021
Narrow space working Installation of levelling pad Install 1 layer Preparation of connection
st
sace.Installation of soil Nailing panel wall soil nailing
Connect soil nail bar with Avery 0.375m compact with Install steel strip Project completion
steel strip small roller compactor