Page 38 - BATANGKALITERRALINK_SMNR_PIAWAI_JKR_2024
P. 38

TerraLink Project at Taman Naga Emas, KL. 2021





























       Narrow space working                                   Installation of levelling pad                Install 1 layer                 Preparation of connection
                                                                                                                      st
       sace.Installation of soil Nailing                                                                   panel wall                      soil nailing
























               Connect soil nail bar with                     Avery 0.375m compact with                     Install steel strip                     Project completion

                          steel strip                             small roller compactor
   33   34   35   36   37   38   39   40   41   42   43