Page 13 - Pengawasan Kerja Pembinaan Sistem Asas
P. 13

Position                                                         )
                                   (eccentricity










              • < 75mm in any direction


              • > 150mm from pile to pile


                   cap edge










                 Disemak semula sebaik sebelum
                 cerucuk ditanam




       Immediately before pile installation or

       casting of foundation, the foundation point

       shall be checked by the Contractor again


                                                       S10 - Cl 10.2.1
                                                       Sec C - Cl 2.1