Page 25 - Seminar Spesifikasi Piawai Geoteknik Section 16
P. 25

INTERNAL STABILITION



























                16.2 INTERNAL STABILIZATION                                       HORIZONTAL DRAIN               TIEBACK WORKS                 HYBRID ANCHOR



                GENERAL CONTENT                                                  SPJ/2013      SPJ/2024       SPJ/2013       SPJ/2024       SPJ/2013       SPJ/2024

                1.    GENERAL                                                                                      
                2.    SCOPE OF WORKS                                                                               

                3.       RESPONSIBILITY BY CONTRACTORS

                4.       MATERIALS, PACKING & STORAGE                                                              
                5.       CONSTRUCTION AND INSTALLATION                                                             

                6.       PLANT & EQUIPMENT                                                                         

                7.       QUALITY CONTROLS CALIBRATION
                8.       ACCEPTABILITY & COMPLIANCE

                9.       MAINTENANCE DURING LIABILITY PERIOD
   20   21   22   23   24   25   26   27   28   29   30