Page 36 - Pre Qualification 2019
P. 36
EXPERIENCE l WISE CONTROL.Inc.
Experience List
POWER
No. PROJECT NAME CUSTOMER END USER
129 ASSUIT HRSG DOOSAN E & C GE ENERG
130
131 Mega CCPP Plant(1600MW) NAAMA SAMSUNG C & T SONELGAZ
132
133 JEJU Combined Cycle Power Plant FIELD INSTRUMENT DOOSAN E & C KOMIPO
134
135 NAAMA/MOSTAGHANEM HRSG BHI SONELGAZ
136
137 SBPL CFPP, 500MW DAELIM SBPL
138
139 JEJU CCPP, 2 x HRSG GEPSK KOREA MID
140
141 POSEUNG BIOMASS COGENERATION DAELIM POSUENG
142
143 TVEP PROJECT HYUNDAI Engineering Therma Vis
144
145 LVSR PROJECT HYUNDAI Engineering LOTTE VER
146
147 YANBU PHASE 3 POWER PLANT SAMSUNG Engineering SWCC
148
149 Mega CCPP Plant(1600MW) NAAMA BHI SONELGAZ
150
151 PACO Coal Fired Power Plant Project SK E & C MINERA PA
152
153 Facility D IWPP SAMSUNG C & T Umm AI Ho
154
155 BANPONG UTILITIES SPP PROJECT Integrated system Provider for Electric & Control EGCO
156
157 SAFI IPP, 693MWx2 DAEWOO E & C SAFI ENER
158
159 PIEM BOILER, 360MWx1 DHI IEM S.A.
160
161 KIRIKKALE IPP, 950MW SAMSUNG C & T ACWA POW
KARABATAN CCPP DOOSAN Karabatan Utili
CHUNCHEON CHP, 1x HRSG BHI CHUNCHE
Qatar Facility D IWPP, 2400MW HHI Qatar Gener
KIRIKKALE IPP, 950MW SAMSUNG C & T ACWA POW
JJP BIOMASS STG 2 BHI JJP
IGD-E ONSHORE PIPELINE & HABSHAN MODIFICATION HANSOL SEENTEC GASCO
Qatar Facility D IWPP, 2400MW SAMSUNG C & T Qatar Gener
WEST DAMIETTA, 4x125MW DOOSAN GE/Egyptia
CHILE KELAR Project SAMSUNG Engineering BILLITON
KHABAT Thermal Power Plant FGD STX Co.,Ltd., KOGAS AK
SHUQAIQ STEAM POWER PLANT HYUNDAI HEAVY SEC
PAGBILAO 420MW #3 CFPP PROJECT DAELIM INDUSTRIAL PAGBILAO
MALAYSIA TNB FAST TRACK 3A PROJECT (BOP) DAELIM INDUSTRIAL TNB
SHUQAIQ SPP HHI SEC
TUNG HSIAO HRSG #6 DOOSAN MHPS
KHABAT THERMAL POWER, 1&2 BHI/POSCO E&C MOE