Page 120 - GM Booklet Dec 2022 demo
P. 120
2. TRACTION SUB-STATIONS POSITION:
S.No. Name of TSS Commisioned on Feeding Zone
1. DTP TSS 23.07.2022 HPG/SP to
GWD/SP
2. MOB TSS 28.10.2022 SFX/SP to KMC
3. PASR TSS 29.10.2022 GWD/SP to RC/SP
*. SNF/TSS of SC Division feeding from SFX/SP to HPG/SP.
*. MRTD/TSS of SC Division feeding from NZB to BDHN.
*. RGM/TSS of GTL Division feeding From DHNE/SP to KRNT.
III. Good Works done by TRD/HYB during the year 2022-23( Till Nov 30-2022) :
1. Replacement of existing O portal with R portal at KCG yard due to
klaying of track for IOH SHED at loc.7/25-26.
st
2. Cross feeder elimination work done at SFX/SP to eliminate the 1 cross feeder.
3. 2 new masts with cantilever assembly erected at KCG yard and
extended 38M OHE on Engine siding to accumulate extra
locomotives.
4. 19No. LA disconnectors provided at MOB/TSS, MED/SSP, BMO/SSP, SFX/SP.
5. Provided Nylon mesh on 40No. of Portals/TTC to reduce CB
tripping between UR and MOB.
IV. MILESTONE OF TRD HYB DIVISION DURING 2022-23:
A. Energization of newly constructed Traction sub-station
Divitipalli(DTP/TSS): Charged on 23.07.2022
Divitipalli TSS of 132/25KV charged successfully on 23.07.2022 by
extending 132KV supply From Timmajipeta TSTRANSCO sub-stati
B. Energization of newly erected OHE:
i. Energization of newly Erected OHE between MOB – KMC :
Newly Erected OHE on single BG line section between MANOHARABAD –
KAMAREDDY (RKM: 66.37KM, TKM: 82.53KM) Energized and approved by
PCEE/SCR on 27.10.2022.
118