5. In connection with Railway Electrification works, the following works commissioned by
RE/SC organization:
a. Energisation of conventional OHE with 25KVA carried out between
Manoharabad - Kamareddisection on 27.10.22 and Mahabubnagar-Gadwal
section on 27.11.22.
b. Existing PTJ single line tokenless block instruments replaced with UFSBI of
M/s Deltron make and HASSDAC of M/s GGtronics make in the above
sections.(Total 12 block sections)
6. Replaced existing mechanically operated lifting barrier with Electrically operated
lifting barrierof MFT/Workshop at LC No.192/T at Nizamabad yard on 01.08.2022 ,
LC No.73/T at Devarakadra yard on 08.09.2022 and LC No.172/T at Karkheli yard on
29.11.2022 by open line.
7. Commissioned Provision of Sequential Route Release of UP and Down calling on
Signals S40A and S1A at Kachiguda station on 04.11.2022.
55