Experience Working Near Railways
Support for station refurbishments
Brief description:
CGL were commissioned by rail contractors Spencers plc to
undertake investigation and the design of foundations for
the refurbishments of Paisley, Cosford, Three Bridges and
Boxhill:
Three Bridges, Surrey
Ÿ Site investigation works
Ÿ Geotechnical and geoenvironmental reporting
Ÿ Slope stability assessment
Ÿ Foundation design
Ÿ Support through the Form A to C approval process
Ÿ Reuse of foundations Barge mounted rig investigation Canary Wharf
Ÿ Retaining structure designs
Paisley station refurbishment
Strategic line upgrades - West Anglia main line capacity
improvement scheme
Brief description:
Volker Fitzpatrick engaged CGL to develop an earthworks
strategy for Network Rail's £170 million Lee Valley Rail
programme, which has provided a third track on 5.5km of
the West Anglia Main Line between Lea Bridge and Angel
Road stations in north London.
Ÿ Earthworks strategy
Ÿ Materials management plan
Ÿ Remediation method statement
Ÿ Design of contamination protection measures
Ÿ Liaison with regulatory authorities
Ÿ Monitoring and verification of works
Schematic of new Lea Bridge Station
Geoenvironmental support
Brief description:
Osborne were called in by Network Rail following a landslide
and the collapse of 80m of track at Botley. During repair a
diesel tank ruptured and up to 900litres of fuel oil spilled.
CGL were brought in by Osborne to provide:
Ÿ Site investigation
Ÿ Liaison with regulating authorities
Ÿ Site monitoring
Ÿ Validation of contamination control measures
Collapsed embankment, Botley