Page 2 - Waste Management for Construction Projects
P. 2

Godalming             London               Exeter
          01483 310600          020 3096 7567        01392 439905
          Harrogate             Bristol              Dublin
          01423 276000          0117 373 6140        (01) 554 6210





      Waste Management for Construction Projects




      Waste Management Training                                 A Selection of CGL's Successful Projects
      CGL routinely provides bespoke waste management
      training to technical and managerial staff in various     Westfield House:  for Galliford Try - CGL's value
      formats such as breakfast briefings, part day             engineering of foundation and basement arisings
      seminars or full day interactive training courses at      saved around £4M in disposal costs. CGL also
      clients' premises.                                        advised on safe handling of asbestos contaminated
                                                                spoil.
      CGL's Expertise and Assurance
      CGL is accredited to ISO 9001 and ISO 14001 and is        Wandsworth Riverside Quarter: for Frasers
      a member of the Association of Geotechnical and           Property - since 2001 CGL has provided detailed
      Geoenvironmental Specialists (AGS).                       waste classification for basement arisings on this
                                                                former oil refinery and depot.  This has reduced the
      CGL provides ground solutions that are well               client's landfill tax bill by millions of pounds over the
      engineered, pragmatic and innovative. The company         project lifetime.
      uses the specialist skills and experience of its team
      to exceed the expectations of clients.                    Channels Golf Club:  for Bellway Homes - CGL
                                                                produced an MMP and independent QP declaration
      Appropriate levels of insurance are held for the          for re-use of excess natural arisings from another
      range of works and scale of projects covered by           site as capping on this development site.
      CGL.
                                                                Church Crookham:  for Taylor Wimpey - CGL
                                                                produced an MMP which enabled safe re-use of
                                                                impacted material as required fill within the
                                                                residential development.

                                                                Rail Depots: for Volker Fitzpatrick - CGL’s work on
                                                                these projects included MMP preparation and QP
                                                                declaration to enable safe re-use of impacted
                                                                arisings in the development, avoiding disposal and
                                                                import costs of virgin material.



























                                           visit our website at cgl-uk.com
   1   2