Page 12 - ISG Induction Rev 13 English inc CORONAVIRUS - TEST
P. 12

SITE ENTRANCE


















































































       All construction site traffic must enter the site from the south road. Traffic
       leaving site must use Rue de Roseaux to the north, following the road to the
       roundabout at the end of the road. DO NOT USE GATE 2 or do a U TURN
       on Rue de Roseaux.



      Choose safe Choose health
   7   8   9   10   11   12   13   14   15   16   17