Page 17 - cleanergy
P. 17
Optimum Solar by Analyzing Max Rooftop Potential and Load
Consumption
Three-step process to optimize the solar installation:
Survey and design the maximum capacity to be installed on the site (roof/land/carport/floating/etc)
Analyze the load profile to understand maximum solar consumption possible with minimal losses
Discuss with customers to understand their future load plans and risk appetite to offer the optimal system capacity