Page 25 - Ride Line Consulting
P. 25

03.




   03.5 Stage 5: 6A, 6C, 7B, 4B and the Skills Area (2026)


     Now access to the hill has been opened up and there is a variety of green and blue options. The additional fun pro-
     gression trails can be added, such as the introduction of an expert trail. This stage such be considered adaptable
     and therefore developed in conjunction with the local riding community.



                                                                         TOTAL                                $139,200
                                                                         Inflation Totals       Year 5
                                                                                                $162,156

























 5





























 STAGE  Note: This is within the proposed timescale for felling operations of the mature stands. With the clear communica-



     tion protocols set out in the proposed SDC MOU, the Trust will have a clear idea of proposed works / timescales and
     can adapt accordingly.





                                                             25
   20   21   22   23   24   25   26   27   28   29   30