Page 25 - Ride Line Consulting
P. 25
03.
03.5 Stage 5: 6A, 6C, 7B, 4B and the Skills Area (2026)
Now access to the hill has been opened up and there is a variety of green and blue options. The additional fun pro-
gression trails can be added, such as the introduction of an expert trail. This stage such be considered adaptable
and therefore developed in conjunction with the local riding community.
TOTAL $139,200
Inflation Totals Year 5
$162,156
5
STAGE Note: This is within the proposed timescale for felling operations of the mature stands. With the clear communica-
tion protocols set out in the proposed SDC MOU, the Trust will have a clear idea of proposed works / timescales and
can adapt accordingly.
25