igem news


                 before installation.
                   This consideration was born from
                 the recognition that, over recent years,
                 there has been a progressive increase
                 in the capacity of domestic boilers. The
                 main reason for this is the increase in
                 the average net heat input of domestic
                 boilers being supplied, largely driven by
                 the requirement for instant hot water
                 for showers and baths.

                 Proposed procedures for installing appliances
                 The following are the proposed
                 procedures for installing appliances.

                 Pre-installation
                 When considering installing an
                 appliance, confirm the pressure at
                 the outlet of the meter is an average
                 of between 18.5mbar to 22mbar as
                 soon as practicable, with all appliances
                 within the property operating at a high
                 operating load over a six-minute period.
                 A high operating load is the normal
                 maximum operating load for the entire   Conditions for reporting low pressure supply   Note 1: The ESP First Call Operative
                 gas installation in the property for a   Engineers may encounter reports of   (FCO) will test the pressure at the outlet
                 period of high demand. To replicate this,   poor pressure or be unable to achieve   of the meter, expecting an average of
                 operate the highest output appliance   the appliance’s required inlet pressure   between 18.5mbar to 22mbar with all
                 at its maximum load (e.g., for boilers,   and/or heat input during their work. In   appliances within the property operating
                 depending on the appliance type, by   such instances, confirm the pressure   at a high operating load over a six-
                 running two hot water taps on full flow),   at the outlet of the meter is an average   minute period
                 all other heating appliances at maximum   of between 18.5mbar to 22mbar with
                 load and any other appliances at 50 per   all appliances within the property    Note 2: The customer may be required
                 cent load (e.g., by lighting two burners of   operating at a high operating load over   to contact their gas supplier. The
                 a four burner hob).              a six-minute period. If the average   details of the supplier and the means of
                   Note: Ensure there is enough pressure at   pressure is below 18.5mbar, report to   contacting them is included on the gas
                 the meter outlet minus the internal pipework   the Gas Emergency Service Provider   supplier’s invoice.
                 designed pressure loss to supply the new   (ESP) contact centre.
                 appliance with adequate inlet pressure.  If it is known that these pressures    Note 3: The GTs need to be aware
                                                  are affecting the safe performance of an   of incidents of low pressure on the
                 Commissioning                    appliance, or the appliance is deemed   network in case the issue is not confined
                 Verify the appliance inlet gas pressure   to be unsafe, then the Gas Industry   to one property and action is required
                 as per the manufacturer’s instructions   Unsafe Situations Procedure (GIUSP)   to maintain the supply to a number of
                 and operate the installed appliance   must be followed.           properties.
                 at maximum appliance input. The
                 reading shall be as specified by the   The process for reporting low pressure   If the consumer is not satisfied,
                 manufacturer.                    The proposed reporting procedure is:   after the network operator has
                   Maximum appliance input is as   1  If the average working pressure is   concluded the investigation, the
                 specified by the manufacturer in   outside range of 18.5mbar to 22mbar   GT complaint procedure should be
                 the commissioning instructions. For   at the outlet of the meter, the engineer   invoked by the customer, whereby the
                 example, commissioning/chimney    should contact ESP and obtain a   ESP should leave contact information
                 sweep mode, or where not specified, the   reference number.       with the customer.
                 appliance is operating at its maximum   2   Advise the ESP of:
                 appliance input, e.g., hot water mode on    Low pressure (or high pressure)    The full proposals and industry
                 a combination boiler.             readings                        comment form can be found at www.igem.
                   Note: Be aware of any pressure loss    Engineer’s Gas Safe Register number   org.uk/technical-services/comment-on-
                 between the inlet test point and the inlet    Engineer’s phone contact number  draft-standards. Those working in the gas
                 to the appliance isolation valve.  3  If possible, the engineer should wait   industry are invited to read the proposals
                                                   for the ESP, who should call within   and comment.
                 Post commissioning                two hours (if the appliance is new, the
                 On completion of the commissioning   engineer must wait for the ESP).    Supply your comments by 26 August
                 process, confirm the pressure at the   4  The ESP takes responsibility for   to technical@igem.org.uk or send them
                 outlet of the meter is between 18.5mbar   investigating the pressure issues   for the attention of Peter Hurst,
                 to 22mbar with all appliances within the   and sharing the outcome of the   IGEM Technical Officer, IGEM House,
                 property operating at a high operating   investigation with the customer and   26 & 28 High Street, Kegworth,
                 load for a period of six minutes.   installer, as appropriate.    Derbyshire DE74 2DA.