igem news – yppc


                 of ISO 55001 and ISO 45001 we carry   Shortly afterwards, in September   FIGURE 4 INTEGRATED MANAGEMENT SYSTEMS
                 out internal audits at planned intervals   2018, WWU underwent an audit for
                 using the following structure:   the migration to ISO 45001, replacing      SHEA INTERNAL AUDIT
                    Establishing the audit programme  the Occupational Health and Safety
                    Implementing the audit programme  Assessment Series (OHSAS) 18001
                                                                                        ISO 55001
                                                                                                       ISO 45001
                    Monitoring and reviewing the audit   British standard. WWU was the first    ASSET MANAGEMENT    OCCUPATIONAL HEALTH
                  programme                       gas distribution network to successfully   SYSTEMS  & SAFETY MANAGEMENT
                    Improving the audit programme  achieve the standard, receiving two                 SYSTEMS
                   Corrective actions identified during   minor non-conformities relating to
                 an audit are used to improve the   internal audits.                   CONTEXT OF THE   CONTEXT OF THE
                 management system, which itself is                                    ORGANISATION    ORGANISATION
                 subject to audit.                Project background                                   LEADERSHIP AND
                   Figure 5 demonstrates the SHEA   I was appointed as Asset Officer for   LEADERSHIP  WORKER PARTICIPATION
                 internal audit structure, how it follows   the Process Safety, Standards and
                 the methodology of ISO 55001, ISO   Assurance (PSSA) team in October 2018.   PLANNING  PLANNING
                 45001 and the high-level principles of   When I started the role, I identified
                 plan, do, check, act.            the need to integrate myself into the   SUPPORT       SUPPORT
                                                  SHEA internal audit process, improving
                 Review of SHEA internal audit procedures  my understanding of WWU’s SHEA
                 The SHEA internal audit process itself   objectives and statutory requirements.  OPERATION  OPERATION
                 is subject to audit. This allows WWU to   To achieve these goals, I was tasked
                 provide assurance of conformance with   by my manager to review the SHEA   PERFORMANCE   PERFORMANCE
                                                                                                        EVALUATION
                                                                                        EVALUATION
                 legislation, policies and procedures,   audit policy and procedures and
                 as well as evaluate whether our audit   address the recommendations and   IMPROVEMENT  IMPROVEMENT
                 process remains appropriate to achieve   audit findings of the high-level review.
                 our SHEA objectives.             However, I wanted to go beyond      PLAN    DO    CHECK   ACT
                   When looking at accident causation   addressing these recommendations, I
                 within our business, there are many   wanted to engage with my colleagues
                 layers or controls to mitigate hazard or   from the different audit teams across
                 accidents occurring.             the business, understanding their   Once these objectives were agreed,
                   Reflecting on the ‘Swiss cheese   unique approaches to auditing SHEA   I initiated contact with my colleagues
                 model’, each cheese slice illustrates   activities and obtaining their opinion   within operations and the WGA.
                 a layer of defence between hazards   and endorsement for my proposed
                 and accidents occurring. These layers   changes to the current processes.  Connecting with colleagues
                 can include different controls such as   Before commencing the project, I   As a new member of the PSSA team, I
                 policies and procedures, inspections,   established my key end goal objectives   realised it was going to be important for
                 safe control of operations (SCO)   which I wanted to achieve by the end of   the delivery of this project to establish
                 and audits. There can be flaws or   December 2018:                positive working relationships with my
                 weaknesses in each layer which is     To review and update:       colleagues in operations and the WGA,
                 represented by the holes. When these   • WWU’s policy for SHEA (internal)   as well as the wider asset management
                 holes align this can allow opportunity   audit (WW/PL/A/2)        team. In early November 2018, I invited
                 for accidents to occur, or provide a   • WWU’s management procedure for   the Operations Health, Safety and
                 “trajectory of accident opportunity”.  SHEA (internal) audit (WW/PM/A/3)   Environment Manager and the Safety &
                   By evaluating the effectiveness of   • WWU’s work procedure for SHEA   Integrity Manager for the WGA to meet
                 our SHEA internal audit policy and   (internal) audit (WW/PR/A/4)  with me.
                 procedures, we can demonstrate      Integrate the policy and procedure   The purpose of these meetings
                 compliance with our asset management   documents, so that they    was to discuss the recommendations
                 and occupational health and safety   complimented each other, were   and audit findings around the SHEA
                 managements systems. It also allows   consistent, and fit better together as   internal audit process, plus my ideas
                 us to identify any weaknesses in our   a whole                    for implementing improvements. I
                 processes, apply corrective actions and     Evolve a better fit across the   also wanted to gain their insight and
                 explore opportunities for continual   three areas of the business (asset   opinions on the proposals.
                 improvement. In other words, we are   management, WWU operations and   Opening a dialogue with my
                 ensuring that our cheese is not past its   the WGA)               colleagues in operations and the WGA
                 sell-by date.                       Ensure the overarching principles for   identified common themes and priorities
                                                   SHEA internal audit are consistent  in terms of the SHEA audit process.
                 Opportunities for continual improvement    Review and update the policy and   However, there were also challenges.
                 Review recommendations and        procedures to address the two minor   Due to the nature of our business, the
                 management system findings        non-conformities identified during   different departments require a flexible
                   During July and August 2018, a   the ISO45001 migration audit   framework that defines core principles
                 well-respected industry auditor carried     Address recommendations made   whilst allowing different business
                 out an independent high-level review   during a high-level review of WWU   units to adapt to their needs. This was
                 of our SHEA and engineering audit   SHEA audit process            something I had to ensure was reflected
                 process. This high-level review provided     Review and implement continual   throughout the updated procedures,
                 recommendations and opportunities for   improvement, preparing for the audit of   particularly regarding inputs into the
                 WWU to improve the SHEA audit process.  the asset management system in 2019  audit plan and timescales.