Page 218 - GMB 2021_Float
P. 218

Two coaches toppled with the help of 140T   ADRM/O/SC, Sr DSO/SC witnessed  the
               Crane to create scene                           mock exercise

















               SPMRV/KZJ staff made arrangements to            NDRF team cutting the windows to rescue
               cut the window.                                 the passengers















               Satellite link was established by NDRF.         Removal of main door of a coach was less
                                                               time consuming and removed in 13 minutes.
   213   214   215   216   217   218   219   220   221   222   223