Page 13 - aruba-today-20220909
P. 13
BUSINESS Friday 9 September 2022
A13
NASA fixing moon rocket leaks, hoping for Sept. HEALTH
launch try DOCTOR ON DUTY
Oranjestad
Hospital 7:00 pm / 10:00pm
Tel. 527 4000
By MARCIA DUNN
AP Aerospace Writer San Nicolas
CAPE CANAVERAL, Fla. Imsan 24 hours
(AP) — NASA is replac- Tel.524 8833
ing leaky seals in its moon Women in Difficulties
rocket at the pad in hopes PHARMACY ON DUTY
of launching it on its first Oranjestad:
test flight by the end of this Eagle tel. 587 9011
month. San Nicolas:
San Lucas tel. 584 5119
Managers said Thursday Women in Difficulties
they will conduct another OTHER
test after the repairs to Dental Clinic 587 9850
ensure all hydrogen fuel Blood Bank Aruba 587 0002
leaks are plugged. If that Urgent Care 586 0448
test goes well and if the Walk-In Doctor’s Clinic
Space Force extends a +297 588 0539
Women in Difficulties
flight safety waiver then EMERGENCY
NASA could take another
stab at launching the 322- Police 100
foot rocket in late Septem- Oranjestad 527 3140
ber. Otherwise, the rocket Noord 527 3200
will return to the hangar for Sta. Cruz 527 2900
584 5000
San Nicolas
additional work, delaying Police Tipline 11141
liftoff until at least October. The NASA moon rocket as stands on Pad 39B for the Artemis 1 mission to orbit the Moon at the Ambulancia 911
A series of hydrogen fuel Kennedy Space Center, Tuesday, Sept. 6, 2022, in Cape Canaveral, Fla. Fire Dept. 115
leaks and other prob- Associated Press Red Cross 582 2219
lems halted back-to-back TAXI SERVICES
launch attempts last week. by an extra two weeks or Engineers are hopeful that can knock this problem Taxi Tas 587 5900
The Space Launch System more to avoid moving the replacing a pair of seals in flat,” he told reporters.q Prof. Taxi 588 0035
rocket the most powerful rocket back to the hangar. the hydrogen fuel lines at Taxi D.T.S. 587 2300
ever built by NASA holds But every time the rocket the bottom of the rocket Taxi Serv. Aruba 583 3232
a crew capsule with three moves between the han- will take care of any linger- A1 Taxi Serv. 280 2828
test dummies. The space gar and launch pad adds ing leaks. Women in Difficulties
agency wants to send the “routine wear and tear, As an extra precaution, TRAVEL INFO
capsule into lunar orbit and I don’t want to do the launch team plans “a Aruba Airport 524 2424
on a trial run, before put- that” unless necessary, kindler and gentler ap- American Airlines 582 2700
ting astronauts on the next said chief engineer John proach to tanking” dur- Avianca 588 0059
flight, in 2024. That around- Blevins. There already have ing the final phase of the Jet Blue 588 2244
the-moon mission would been three trips to the countdown, slowing the Surinam 582 7896
pave the way for the first pad this year for practice flow of fuel at times to re- Women in Difficulties
human moon landing in 50 countdowns and, most duce stress on the seals, AID FOUNDATIONS
years, currently scheduled recently, the thwarted according to Mike Bolger,
for 2025. launch attempts of Aug. 29 a program manager. FAVI- Visually Impaired
Tel. 582 5051
“We need to get the tank- and Saturday. “We’re optimistic that we
ing test done and then Alcoholics Anonymous
we’ll have to look at what Tel. 736 2952
Narcotics Anonymous
is the realism and sched- Tel. 583 8989
ule” to make a launch at- Fundacion Contra Violencia
tempt as early as Sept. Relacional Tel. 583 5400
23, said Jim Free, who’s in Centre for Diabetes
charge of NASA’s explora- Tel. 524 8888
tion systems development. Child Abuse Prevention
To launch in late Septem- Tel. 582 4433
ber, NASA needs the OK Quota Club Tel. 525 2672
Women in Difficulties
from the Space Force in General Info
Cape Canaveral, which
oversees the rocket’s self- Phone Directory Tel. 118
destruct system. Batteries
are needed to activate
the system if the rocket
veers off course toward
populated areas. These
batteries must be retested
periodically, and that can
only be done in the han-
gar. The military would
have to extend the certi-
fication of those batteries facebook.com/arubatoday/