Page 41 - KZN Top Busines Portfolio 2020/21
P. 41

and is now in the process of developing and even
       operationalising this dream.
       Those who described this as “a pipe dream”, are now
       waking up to a reality where the Dry Port is ready to
       start operations and where:
          ƒ A business structuring model, with clear
          community ownership and involvement, has
          been concluded between CRLHC and
          the AmaXimba Development Trust (ADT)
         ƒ Optimal coordination, alignment and integration is
          facilitated, and regulatory applications are
          processed, with the support of a Project
          Facilitation Team, co-convened by Trade and
          Investment KwaZulu-Natal (TIKZN) and the
          eThekwini Municipality Chief of Operations Officer   Project Composition
         ƒ A land purchasing framework has been developed
          to secure phased access to short, medium, and    The Cato Ridge Dry Port is a R18 billion project to
          longer term development phases of the project  be rolled out over the next 25 to 30 years and is
         ƒ A heads of agreement between CRLHC and    comprised of:
          Transnet, which outlines the respective roles and      ƒ An interim rail terminal to handle approximately
          responsibilities and various operational modalities       90K TEUs per annum, to be expanded to a fully-
          in respect of rail and terminal facilities, is in the       fledged dry port intermodal facility with capacity
          final phases of conclusion and is ready for signing     to handle 500K TEUs. This will be
         ƒ A heads of agreement between CRLHC and Engen       supported by SARS customs services to manage
          has been concluded in respect of the development       freight clearance and bonded warehousing
                                              facilities
          of a truck stop and staging facility    ƒ A truck stop and staging facility to accommodate
          ƒ The conceptual design for the new KwaXimba N3        300 parking bays with all ancillary support
          Interchange has been concluded and  environ-      structures for drivers, as well as vehicle
          mental impact assessment for this strategic       maintenance and testing
          intermodal infrastructure component is soon to      ƒ Logistics parks to accommodate warehousing,
          be completed                         freight handling logistics and freight preparation
          ƒ A bulk services agreement between CRLHC and    facilities
          the eThekwini Metropolitan Municipality is being      ƒ An industrial park to accommodate manufacturing
          negotiated and is facilitated by the eThekwini       opportunities presented by its close proximity to
          Chief of Operations Office; and last but definitely       the Dry Port and Logistics land uses; and in the
          not least                            longer term
          ƒ A transformation strategy has been developed      ƒ A tank farm as a strategic fuel storage facility.
          in full collaboration and in partnership with the    It is important to conclude by emphasising that the
          AmaXimba Development Trust, representing the    CRLHC is implementing this project as an agent of the
          community and recognising their ownership in    community and the community is not merely regarded
          the project, to guide the implementation of    as an incidental beneficiary of the development. The
          community development and empowerment    community owns this development in partnership
          programmes and projects.          with its development agent, the CRLHC.


       Full Name of Company: Cato Ridge Logistics Hub   KEY PERSONNEL
       Consortium                           Chairman: Sibusiso Mazibuko
       Nature of Business:  Subsidiary of Inkanyezi YeZulu   CEO: Warwick Lord
       Investment (Pty) Ltd, a Black-owned and managed   Head of Marketing: Bheki Mathe
       entity                               CONTACT DETAILS
       Services/Products: Established to spearhead the   Head Office
       development of the Cato Ridge Dry Port.  Physical address: 3 School Road, Cato Ridge,3680
       Date Established: 2005               Te;: +27(0)31 782 0053/12
                                            E-mail:  info@crlhc.co.za
       B-BBEE Status:                       Website: www.crlhc.co.za
                                                                                39
   36   37   38   39   40   41   42   43   44   45   46