Page 10 - Facca Brochure
P. 10

ERECTIONS






            Facca plans, designs and executes the majority        We  also specialize in tandem lifts of long
            of our structure erections safely and efficiently.    elements. Our largest installation to date being a
            Our fleet of mobile and crawler cranes combined       30+  meter, 220,000  lb bridge  deck and girder
            with the experience and capability of over a dozen    supermodules during evening closures over
            skilled and licenced (Red Seal Branch 1 - 339A)       Highway 401.
            crane operators allows Facca to plan, design and
            execute all of our structural erections safely and    Our experience allows us to execute production
            efficiently.                                          erection  extremely efficiently  while controlling
                                                                  cost.  An example of this  efficiency  was our
                                                                  contract for the erection of 1200+ precast NU
            Supplementing our crane fleet are modular             girders on  the Herb Gray Parkway  in Windsor,
            barges to accomodate marine work, as well as          Ontario.  Utilizing  our equipment  and forces,  in
            elevated work platforms for safe and flexible         one ten hour shift  we managed to erect  and
            crew access during erection.                          brace thirty-two 120,000lb, 34 meter girders.















































            8.
   5   6   7   8   9   10   11   12   13   14   15