ERECTIONS
Facca plans, designs and executes the majority We also specialize in tandem lifts of long
of our structure erections safely and efficiently. elements. Our largest installation to date being a
Our fleet of mobile and crawler cranes combined 30+ meter, 220,000 lb bridge deck and girder
with the experience and capability of over a dozen supermodules during evening closures over
skilled and licenced (Red Seal Branch 1 - 339A) Highway 401.
crane operators allows Facca to plan, design and
execute all of our structural erections safely and Our experience allows us to execute production
efficiently. erection extremely efficiently while controlling
cost. An example of this efficiency was our
contract for the erection of 1200+ precast NU
Supplementing our crane fleet are modular girders on the Herb Gray Parkway in Windsor,
barges to accomodate marine work, as well as Ontario. Utilizing our equipment and forces, in
elevated work platforms for safe and flexible one ten hour shift we managed to erect and
crew access during erection. brace thirty-two 120,000lb, 34 meter girders.