Page 16 - Facca Brochure
P. 16
DEEP FOUNDATIONS
Facca has been constructing deep foundations
for over a decade, starting with driven piles and
more recently drilled piles since our purchase of
a hydraulic drill rig. Our fleet of crawler cranes in
combination with multiple sets of diesel “OUR SKILLED &
hammers and leads (fixed or hanging), vibratory
hammers of various sizes, and hydraulic impact
hammer for sensitive sites allows us to install EXPERIENCED
piled foundations in any situation. Our Lo-Dril
can drill lined and unlined holes as deep as 60’, OPERATORS SHARE
and using a cluster drill attachment we can
socket into rock of any strength. THE PHILOSOPHY;
Second to safety, our skilled and experienced ACCURACY IS JUST
operators share the philosophy that accuracy is
just as important as production. We always strive AS IMPORTANT AS
to ensure that all piles are installed perfectly so
that we can finish proud of every job we do,
whether it’s a piled footing for a bridge that will PRODUCTION.”
never be seen, or a curved sheet pile wall in a
busy marina.
14.