Page 23 - Facca Brochure
P. 23
LIST OF DESIGN-BUILD PROJECTS COMPLETED
TBSI was the Lead Designer and Project FACCA & TBSI
Coordinator for Facca Incorporated on nine (9)
Design-Build projects from 2011 to 2016, as
shown in the summary below.
YEAR NAME TYPE OF SERVICES PERFORMED CONSTRUCTION
STRUCTURE VALUE
2011- MTO Contract DB-2011-2028: Concrete Structural Design, Demolition details of the
2012 Replacement of the Highway Rigid Frame existing 3-span slab-on-steel girder bridge $2,900,00.00
Box
12 CNR Overhead at Orillia.
and sequencing during 5-day highway closure,
Contract Administration
2011- MTO Contract DB-2011-6000: Slab on Structural Design, Demolition details of the
2012 Replacement of Expansion Concrete existing 3-span slab-on-steel girder bridge $2,200,00.00
Girders
and sequencing during 5-day highway closure,
Joints for 8 structures along
Various Highways in the Contract Administration
Northwest Region.
2011- City of Windsor, Tender no. Slab on Steel Structural Design, Full bridge concrete deck
2012 63-11, Design-Build project Girders removal and sequencing over the CPR railway
for the Deck Replacement
tracks leading into the Windsor-Detroit Tunnel,
and rehabilitation of the Contract Administration $2,000,00.00
College Avenue CPR
Overhead in Windsor, Ontario.
2012- MTO Contract DB-2012-2014: Concrete Structural Design, Demolition details of the
2013 Replacement of Highway 12 Rigid Frame existing 3-span slab-on-steel girder bridge $2,200,00.00
Box
and sequencing for the staged construction
CNR Overhead at Midland.
on Highway 12, Contract Administration
2013- MTO Contract DB-2013-6010: Precast Structural Design, Demolition details and
2015 Highway 614 Culvert Concrete Slab sequencing of the staged removal of $2,800,00.00
on Sheetpile
Replacements at Phillips
existing timber culverts in poor condition,
Creek, Barbara Creek and Abutments Contract Administration
Barehead Creek.
2013- MTO Contract DB-2013-2019: Concrete Structural Design, Demolition details of the
2014 Replacement of Highway 11 Rigid Frame existing 3-span slab-on-steel girder bridge
CPR Overhead and the
Box
and sequencing for the staged construction
Removal of Highway 11 CNR on Highway 11, Contract Administration $2,900,00.00
Overhead, near the Township
of Severn.
2013- MTO Contract DB-2013-6013: Precast Structural Design, Demolition details and
2015 Structural Culvert Replace- Concrete Slab sequencing of the staged removal of existing $2,800,00.00
on Sheetpile
ments at Raleigh Creek, Hwy
concrete culverts in poor condition, Contract
17 and Patara Creek, Hwy 72. Abutments Administration
2013- MTO Contract DB-2013-2035: Slab on Structural Design, Demolition details and
2015 Highway 400 over Simcoe Concrete sequencing of the staged removal of $5,000,00.00
County Road 23, Twin Bridge
existing concrete barriers and deck
Girders
Rehabilitation. overhangs, Contract Administration
2016- MTO Contract DB-2016-6018 Structural Structural Design, Demolition details and
2017 Highway 596, Alice Creek Plate sequencing of the staged removal of existing $1,500,00.00
Culvert Replacement
Corrugated
CSP culvert, Contract Administration
in progress Steel
21.