LIST OF DESIGN-BUILD PROJECTS COMPLETED


            TBSI was the Lead Designer and Project                                 FACCA & TBSI
            Coordinator for Facca Incorporated on nine (9)
            Design-Build projects from 2011 to 2016, as
            shown in the summary below.



               YEAR      NAME                  TYPE OF     SERVICES PERFORMED                  CONSTRUCTION
                                               STRUCTURE                                       VALUE

               2011-     MTO Contract DB-2011-2028:   Concrete   Structural Design, Demolition details of the
               2012      Replacement of the Highway   Rigid Frame   existing 3-span slab-on-steel girder bridge   $2,900,00.00
                                               Box
                         12 CNR Overhead at Orillia.
                                                            and sequencing during 5-day highway closure,
                                                            Contract Administration
               2011-     MTO Contract DB-2011-6000:   Slab on   Structural Design, Demolition details of the
               2012      Replacement of Expansion   Concrete   existing 3-span slab-on-steel girder bridge   $2,200,00.00
                                               Girders
                                                            and sequencing during 5-day highway closure,
                         Joints for 8 structures along
                         Various Highways in the            Contract Administration
                         Northwest Region.
               2011-     City of Windsor, Tender no.   Slab on Steel   Structural Design, Full bridge concrete deck
               2012      63-11, Design-Build project   Girders  removal and sequencing over the CPR railway
                         for the Deck Replacement
                                                            tracks leading into the Windsor-Detroit Tunnel,
                         and rehabilitation of the          Contract Administration             $2,000,00.00
                         College Avenue CPR
                         Overhead in Windsor, Ontario.
               2012-     MTO Contract DB-2012-2014:   Concrete   Structural Design, Demolition details of the
               2013      Replacement of Highway 12   Rigid Frame   existing 3-span slab-on-steel girder bridge   $2,200,00.00
                                               Box
                                                            and sequencing for the staged construction
                         CNR Overhead at Midland.
                                                            on Highway 12, Contract Administration
               2013-     MTO Contract DB-2013-6010:   Precast   Structural Design, Demolition details and
               2015      Highway 614 Culvert   Concrete Slab   sequencing of the staged removal of   $2,800,00.00
                                               on Sheetpile
                         Replacements at Phillips
                                                            existing timber culverts in poor condition,
                         Creek, Barbara Creek and   Abutments  Contract Administration
                         Barehead Creek.
               2013-     MTO Contract DB-2013-2019:   Concrete   Structural Design, Demolition details of the
               2014      Replacement of Highway 11   Rigid Frame   existing 3-span slab-on-steel girder bridge
                         CPR Overhead and the
                                               Box
                                                            and sequencing for the staged construction
                         Removal of Highway 11 CNR          on Highway 11, Contract Administration  $2,900,00.00
                         Overhead, near the Township
                         of Severn.
               2013-     MTO Contract DB-2013-6013:   Precast   Structural Design, Demolition details and
               2015      Structural Culvert Replace-  Concrete Slab   sequencing of the staged removal of existing   $2,800,00.00
                                               on Sheetpile
                         ments at Raleigh Creek, Hwy
                                                            concrete culverts in poor condition, Contract
                         17 and Patara Creek, Hwy 72.  Abutments  Administration
               2013-     MTO Contract DB-2013-2035:   Slab on   Structural Design, Demolition details and
               2015      Highway 400 over Simcoe   Concrete   sequencing of the staged removal of   $5,000,00.00
                         County Road 23, Twin Bridge
                                                            existing concrete barriers and deck
                                               Girders
                         Rehabilitation.                    overhangs, Contract Administration
               2016-     MTO Contract DB-2016-6018  Structural   Structural Design, Demolition details and
               2017      Highway 596, Alice Creek   Plate   sequencing of the staged removal of existing   $1,500,00.00
                         Culvert Replacement
                                               Corrugated
                                                            CSP culvert, Contract Administration
               in progress                     Steel