SCHEDULING






            As a Civil Bridge Contractor that is continuously    We feel that utilizing  NetPoint in collaborative
            looking  to  innovate,  Facca has  discovered a      group sessions will foster an open environment
            superior  software  to the traditional  waterfall    between the Owner, Contract  Administrator,
            visual appearance of the Critical  Path Method       Contractor and Subcontractors to communicate
            modeling technique.  After a trial period using      each stakeholder's specific needs as it relates to
            NetPoint GPM⡴ software created by PMA                project delivery. This team approach to schedule
            Technologies from Ann Arbour Michigan, it was        creation  promotes rapid, collaborative, and
            clear that the software offered enhanced             informed project planning.  It allows schedules
            visualization,  resource  management and a           to be created more intuitively  and introduces
            superior user experience which helps all             innovative  concepts  that improve schedule
            stakeholders participate in the scheduling           optimization and analysis.
            process.  Facca  uses  NetPoint schedules
            throughout the tendering, pre-construction, and      We believe scheduling is at the core of a project's
            construction   periods,   as   well   as    for      success, and constant care and management of
            post-construction    analyses.   Facca     has       the schedule is required. Field Personnel are
            collaborated directly with  NetPoint staff to        responsible for daily updates and lookaheads to
            include features tailored to the industry.           track progress, this ensures commitment and
                                                                 ownership  of the project  by all those involved.
                                                                 Progress is tracked by Project Coordinators,
                                                                 who  if required have the ability to increase
                                                                 ground resources to maintain the project
            “SCHEDULING IS                                       schedule.

            AT THE CORE OF                                       We encourage you to find out more information
                                                                 about their software at Pmatechnologies.com