10  Susan C. Cork, Roy Halliwell and Willy Schauwers

            Chapter 2). If there is no reliable piped public   built in a place remote from normal public ser-
            water supply it is advisable to install storage   vices it may be difficult to recruit and retain staff.
            tanks with as large a capacity as possible. These   Lack of good transportation and communication
            can be fixed to the roof to facilitate water flow,   networks can also make it difficult to encourage
            however, a well-fitted pump system is better   sample submission.
            than utilizing gravity flow alone. The water
            pump should be linked up with a power stabi-
            lizer or a power trip switch-voltage protection  Managing supplies
            unit to prevent damage caused by a fluctuating
            power supply.                            The selection, storage and distribution of sup-
              In district laboratories that have an intermit-  plies is an important aspect of laboratory
            tent water and electricity supply, it is essential   maintenance and service provision (see Chapter
            to have a backup to ensure that water is avail-  2). When purchasing equipment, appropriate
            able each day to allow the laboratory to function.   technology should be selected depending on
            For example, an underground storage tank built   practical considerations as well as the needs
            outside the laboratory that can be replenished   of the unit. Careful thought must be given
            either by rainwater (run off from the roof), or in   to maintenance costs as well as the longer-
            the dry season, with water brought by bowser   term requirements of a laboratory unit. This
            from a central supply. Water can then be hand   is especially true with regard to reagents and
            pumped into an overhead tank and supplied by   disposables, for example. Kit tests may be pref-
            gravity to the lab. If a storage tank is built it is   erable to more laborious methods in the short
            important to add suitable filters to prevent the   term but if the cost of replacement reagents
            build-up of silt, which can soon cause a blockage   or kits is too high then such tests may not be
            in the pipes.                            sustainable.
              Hot water can be supplied from electric- or   To ensure a regular flow of general supplies
            gas-heated geysers; this is especially important   and spare parts for equipment it is important
            for the wash room. To reduce the use of hot   to set up an efficient store system. If stores
            water from boilers, try to install the distillation   are not well managed the day-to-day work of
            apparatus in the washing room. This way, the   the diagnostic unit may be impaired especially
            cooling water from the distillation apparatus   where deliveries take several days (or weeks) to
            (temperature about 60°C) can be used for clean-  arrive or where the funds for new purchases are
            ing laboratory glassware and other items that   unavailable. Careful stock control and good fore-
            need washing.                            casting of the requirements for each laboratory
              Distillation and de-ionization of water is    section at the beginning of each financial year
            outlined in more detail in Chapter 2.    are essential.


                                                     Stock control
            transport and communication
            services                                 The functioning and maintenance of a good
                                                     store room requires a well-organized stock con-
            The availability of reliable local transport and   trol and ordering system. The amount of stock
            communication services is very important for   held in a central or regional store will depend on
            the functioning of the laboratory and also for the   the availability of funds, and the projected needs
            well-being of laboratory staff. If a laboratory is   of the laboratory and the associated animal