Page 23 - Presentation
P. 23

A team has to be formed from


                     Maint-Offsite                         ,        Projects                  and


                     inspection. A trailor, small hydra,


                     minimum manpower (6 Nos) with


                     necessary tools and tackles (Sling,


                     D-Shakles) shall be arranged.


                     Roadwise  clearing  of  scrap  /


                     useable  material  shall  be  carried


                     out.  This has  to be sent  to  scrap


                     yard / ware house / place marked


                     for salvaging of materials.  All fire

                     water / utility jobs will be executed


                     from the salvaged materials.
   18   19   20   21   22   23   24   25   26   27   28