Page 23 - Presentation
P. 23
A team has to be formed from
Maint-Offsite , Projects and
inspection. A trailor, small hydra,
minimum manpower (6 Nos) with
necessary tools and tackles (Sling,
D-Shakles) shall be arranged.
Roadwise clearing of scrap /
useable material shall be carried
out. This has to be sent to scrap
yard / ware house / place marked
for salvaging of materials. All fire
water / utility jobs will be executed
from the salvaged materials.