Page 60 - Presentation
P. 60

20. Fire water



                       sprinkler system.





























































                         a. A drain of minimum 2” size has to be provided outside the dyke near the isolation valve to prevent water to

                              sprinklers in case of valve passing and drain the accumulated water after testing.


                         Action: Maint- Field (Offsite)/ F&S / OM&S                                                         Target: 31st December -2021.




                         b. Metallurgy upgradation shall be explored to suit CPCL fire water quality.



                          Action: Inspection                                                                                 Target: 31  August -2021.
                                                                                                                                              st
   55   56   57   58   59   60   61   62   63   64   65