Page 4 - Software Development
P. 4
SOFTWARE DEVELOPMENT The excellence of collaboration
Cycle Report
TCB Name TCB_Olympiada
TCB Serial Number 20154010
Teramon Software Version Version :0.9.3.203
Cycle Number 00002193
Date 27/04/2015 08:00:03
Sensor: TM50-1
Start time: 08:00:03
Serial Number: 369470 - Factory Name: TM50
Initial Position validation method: Resection
Initial Position Measurements
Point Face H. Angle V.Angle Slope Distance
ACN-
3D-R2 I 263.28472 96.54182 136.54063
ACN-3D-R2 II 63.28394 303.45811 136.54143
ACN-3D-R3 I 269.43222 96.52066 143.49059
ACN-3D-R3 II 69.43170 303.47876 143.49079
ACN-3D-R4 I 267.38655 96.61848 139.54656
ACN-3D-R4 II 67.38637 303.38099 139.54716
ACN-3D-R5 I 29.06206 102.00468 63.31563
ACN-3D-R5 II 229.06196 297.99566 63.31543
ACN-3D-R6 I 62.75090 101.94169 60.66450
ACN-3D-R6 II 262.75085 298.05816 60.66430
ACN-3D-R7 I 94.60460 101.40169 76.20883
ACN-3D-R7 II 294.60424 298.59807 76.20873
Initial Position Measurements Averages
Point H.Angle V.Angle Slope distance
ACN- -1.00000 -1.00000 -0.99999
3D-R3
ACN-3D-R2 263.28433 96.54185 136.53967
ACN-3D-R3 269.43196 96.52095 143.48926
ACN-3D-R4 267.38646 96.61874 139.54546
ACN-3D-R5 29.06201 102.00451 63.31489
ACN-3D-R6 62.75088 101.94176 60.66380
ACN-3D-R7 94.60442 101.40181 76.20802
Gold Line Doha Qatar
1. MONITORING SOLUTIONS
b. AMS - TCB
A fully automated data collect solution for real time monitoring
using Total stations and/or GPS.
SYSTEM ADVANTAGES Athens metro line TCB internal
• Portability
• Operation with solar panel in areas without electric power
• Remote control using android application for power on–power off
system.
• Real time alerts using SMS/mail
• 4g/3g Internet connection and optional dual SIM kit
• Full report on each cycle of measurements
• Direct communication with Terramove Database
• Resection solution with lowest number of squares for instrument
position check.
• Automatic calculation of measurement corrections on each
cycle
• Automatic calculation of measurement corrections on each cycle Kassandra gold mines
4