Page 20 - Encardio-Moniterra Brochure
P. 20
ENCARDIO-MONITERRA GROUP
One-Stop Monitoring & Surveying Solutions
Dams
Bridges
Tunnels
Highways
Embankments •High rise buildings • Defomations •Water Table •Excavation Progress
Airports, Seaports •Monuments • Settlements •Water Quality •All TBM parameters
Landslides, slopes •Structures on slope • Displacements •Weather •Operator’s Screen View
Deep excavations •Assets - tunnels, dams, bridges • Distorsions •Vibration •Combined Diagrams
GEOTECHNICAL STRUCTURAL GEODETIC ENVIRONMENTAL TUNNEL BORING
MONITORING MACHINE (TBM)
SURVEYING
PRE/POST GEOMETRY
CONDITION CONTROL PROGRESS CONVENTIONAL
(DILAPIDATION)
• Locating • Geodetic Network • Aerial Imaging/Videography • Land Surveying-Cadastral
• Measuring • Design Review • LiDar • Construction Support
• Recording implementation • Quantity Surveying • Underwater
• Reporting • As Built • Reporting - R.F.Inspection • Mobile mapping
• Building Information • Flood Surveying Subwater
Modeling
ENCARDIO-MONITERRA GROUP
One-Stop Monitoring & Surveying Solutions
19