Page 54 - Encardio-Moniterra Brochure
P. 54

PROGRESS


               One-Stop Monitoring & Surveying Solutions






             Tunneling



             Underground Projects have always been
             a great challenge for Surveyors.


             Encardio-Moniterra engineers managed
             to geometrically lead over 40 successful
             “breakthroughs” .




             Tunnels up to 18Km long, that were

             excavated using:

               NATM
               Blasting

               TBM


             are already under full operation or
             about to.







                                                                                                                        ENCARDIO-MONITERRA GROUP
                                                                                                                             One-Stop Monitoring & Surveying Solutions

                                                                                                                                                            53
   49   50   51   52   53   54   55   56   57   58   59