Page 73 - 2016 FGM Annual Report
P. 73

KJWW ENGINEERING – OFFICE RENOVATION
               KJWW, one of our long time MEP Engineering consultants, hired FGM to provide interior upgrades
               to their office. The renovation to the core of their space included new paint colors, flooring, a
               metal mesh curtain behind the reception desk and wall panels at the circulation paths.























               BAXTER & WOODMAN – OFFICE RENOVATION
               About 10 years ago, FGM designed an addition to the rear of Baxter and Woodman’s corporate
               office  building  in  Crystal  Lake.  After  recently  completing  an  internal  branding  effort,  they
               contacted FGM to renovate and update their entry/lobby to better represent their new corporate
               image and to give it a more modern appearance. The project consisted of all new finishes, a
               reception  desk,  a  remodel  to  the  main  conference  room  and  an  additional  new  secondary
               conference space. It also studied the renovation of their break area  to become a work café
               space.
   68   69   70   71   72   73   74   75   76   77   78